Tech Vault Data Center is an operating data center in South Burlington, Vermont (Chittenden County), operated by Tech Vault, Inc. The public record puts it at a reported $2 million investment.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Tech Vault, Inc.
Facility type
Data center
Location
21 Gregory Drive, Suite 165, South Burlington, Chittenden County, VT, 05403
Coordinates
44.4542, -73.1418 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
$2 million
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Green Mountain Power incentives, $100,000, Green Mountain Power (utility)
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of October 11, 2026. No lawsuit, organized opposition, or contested hearing over Tech Vault Data Center in South Burlington, Chittenden County, Vermont appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

DCK (2011): the facility uses 'water-side economization to cool the facility for much of the year', with APC by Schneider in-row cooling units and a contained rear plenum. Reported PUE is about 1.27-1.45. The source does not say whether heat is rejected evaporatively or through a closed loop.

Public money on the record

ProgramAmountGranted byYear
Green Mountain Power incentives$100,000Green Mountain Power (utility)

Notes on the record

Vermont's first commercial, LEED-certified (Silver, for both the building and data center operations), carrier-neutral colocation facility, per the operator's own site, independently corroborated on address by the Lake Champlain Chamber's member profile. 39,000 sq ft of data center space; a 500KW APC Symetra UPS system and an 800KW diesel generator for backup power. Compliance: SOC 2 Type 2, HIPAA, PCI DSS, NIST 800-53, CMMC. Serves state/federal government, military, legal, financial, medical, educational, manufacturing and logistics clients. In 2013 the State of Vermont awarded Tech Vault a long-term data center services agreement (per Vermont Business Magazine's own headline; the article itself could not be retrieved as of September 2026, so contract length and scope are not independently confirmed beyond that headline). No numeric MW capacity was stated as of September 2026. Precision is approximate because the address includes a specific suite number (#165) within a larger building (OSM building match: way/620853192).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Tech Vault Data Center?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Tech Vault Data Center in South Burlington?

Nothing on record as of October 11, 2026. No lawsuit, organized opposition, or contested hearing over Tech Vault Data Center in South Burlington, Chittenden County, Vermont appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Tech Vault Data Center?

No lawsuit over Tech Vault Data Center appears in the record we track as of October 11, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Tech Vault Data Center use?

No water withdrawal figure for Tech Vault Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Tech Vault Data Center, and how big is it?

Tech Vault, Inc. is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Tech Vault Data Center," updated October 11, 2026, https://suedatacenters.org/data-centers/tech-vault-south-burlington-vt.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/tech-vault-south-burlington-vt, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Vermont Data Center Facility - Tech Vault · Tech Vault, Inc. · retrieved September 21, 2026
  2. 2.Tech Vault, Inc. - Lake Champlain Chamber · Lake Champlain Chamber · retrieved September 12, 2026
  3. 3.State awards Tech Vault long-term data center agreement · Vermont Business Magazine · retrieved September 12, 2026
  4. 4.Tech Vault: Small Company in Spotlight at Gartner (Dec 5, 2011) · Data Center Knowledge · retrieved October 11, 2026
  5. 5.PeeringDB facility records for Vermont (Tech Vault South Burlington) · PeeringDB · retrieved October 11, 2026
  6. 6.Inflect: Tech Vault South Burlington, 21 Gregory Drive · Inflect · retrieved October 11, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us