Krambu Eastern Washington (Newport)
Newport, Pend Oreille County, Washington · All 2 Krambu sites
Krambu Eastern Washington (Newport) is an operating data center in Newport, Washington (Pend Oreille County), operated by Krambu.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Krambu
- Facility type
- Data center, AI use mixed
- Location
- 240 N Union Ave, Newport, Pend Oreille County, WA, 99156
- Coordinates
- 48.1834, -117.0424 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Hydro
- Cooling
- air
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 2026OperatingListed as operational on a statewide tracker; 2020 press described the site as about to come online. Source: dcmap.us
Opposition and litigation at this site
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Krambu Eastern Washington (Newport) in Newport, Pend Oreille County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Reported to draw inexpensive power from a nearby hydroelectric facility; utility not named.
Designed to run without conventional air conditioning, filtering intake air and exhausting server heat directly (2020 description).
Notes on the record
Blockchain and AI computing plus hosting/colocation. The tracker's ~10 MW is an estimate and is not recorded as capacity. Current operation is not confirmed by a 2025-26 primary source.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Merkle Standard Usk Facility · Usk · Merkle Standard (Allrise Capital)14 mi · Operating · 100 MW · Mixed reception
Questions people ask about this site
Is there opposition to the Krambu Eastern Washington (Newport) data center in Newport?
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Krambu Eastern Washington (Newport) in Newport, Pend Oreille County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Krambu Eastern Washington (Newport) data center?
No lawsuit over Krambu Eastern Washington (Newport) appears in the record we track as of October 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Krambu Eastern Washington (Newport) use?
No water withdrawal figure for Krambu Eastern Washington (Newport) is on record here. Cooling is recorded as air, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Krambu Eastern Washington (Newport), and how big is it?
Krambu is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Krambu Eastern Washington (Newport)," updated October 12, 2026, https://suedatacenters.org/data-centers/krambu-newport-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/krambu-newport-wa, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Spokane Journal of Business: Having survived crypto winter, Krambu thrives (Feb 13, 2020) · Spokane Journal of Business · retrieved October 12, 2026
- 2.dcmap.us Washington data center map (Krambu Eastern Washington, Newport, operational, ~10 MW est.) · dcmap.us · retrieved October 12, 2026
- 3.OpenStreetMap Nominatim geocode for 240 N Union Ave, Newport, WA · OpenStreetMap · retrieved October 12, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us