Greensparc Wrangell Data Center (6-Mile Mill site)

Wrangell, City and Borough of Wrangell County, Alaska · All 3 Greensparc sites

CancelledOpposedRecord updated October 18, 2026

Greensparc Wrangell Data Center (6-Mile Mill site) is a cancelled data center in Wrangell, Alaska (City and Borough of Wrangell County), operated by Greensparc. The public record puts it at announced January 2026. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
Greensparc
Facility type
Data center
Location
Wrangell, City and Borough of Wrangell County, AK
Coordinates
56.4708, -132.3767 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
January 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 9, 2026
    Cancelled
    Wrangell Borough Assembly unanimously voted down the land lease Source: KSTK
  2. January 22, 2026
    Proposed
    Wrangell planning and zoning commission voted 3-2 to recommend a 1-2 acre lease at the borough-owned former 6-Mile Mill site; the economic development board had voted 5-0 Source: Ketchikan Daily News / Wrangell Sentinel

Opposition and litigation at this site

Yes. Organized local opposition to Greensparc Wrangell Data Center (6-Mile Mill site) in Wrangell, City and Borough of Wrangell County, Alaska is documented in the public record, without a lawsuit on file in the sources we track. Public opposition centered on power consumption, environmental issues, noise and peak-demand shortages.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

Public opposition centered on power consumption, environmental issues, noise and peak-demand shortages. The assembly unanimously rejected the lease on June 9, 2026, keeping the waterfront for maritime industry.

Source: KSTK

Notes on the record

Proposed 10,000 sq ft building, about 1-2 MW per the CEO, with battery backup and no diesel generators. Coordinates are Wrangell town, approximate; the actual site is the former 6-Mile Mill deepwater port site south of town.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Tell us about your situation

Living near Greensparc Wrangell Data Center (6-Mile Mill site)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Greensparc Wrangell Data Center (6-Mile Mill site) in Wrangell?

Yes. Organized local opposition to Greensparc Wrangell Data Center (6-Mile Mill site) in Wrangell, City and Borough of Wrangell County, Alaska is documented in the public record, without a lawsuit on file in the sources we track. Public opposition centered on power consumption, environmental issues, noise and peak-demand shortages.

Has anyone filed a lawsuit over the Greensparc Wrangell Data Center (6-Mile Mill site)?

No lawsuit over Greensparc Wrangell Data Center (6-Mile Mill site) appears in the record we track as of October 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Greensparc Wrangell Data Center (6-Mile Mill site) use?

No water withdrawal figure for Greensparc Wrangell Data Center (6-Mile Mill site) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Greensparc Wrangell Data Center (6-Mile Mill site), and how big is it?

Greensparc is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Greensparc Wrangell Data Center (6-Mile Mill site)," updated October 18, 2026, https://suedatacenters.org/data-centers/greensparc-wrangell-ak.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/greensparc-wrangell-ak, retrieved October 19, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Data center lease recommended by Wrangell planning group (Wrangell Sentinel) · Ketchikan Daily News / Wrangell Sentinel · retrieved October 18, 2026
  2. 2.Wrangell Borough Assembly votes no on data center proposal · KSTK · retrieved October 18, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us