Sue Data Centers

Data Center Registry

Endicott Bitcoin Mining Pilot

North Slope County, Alaska

PermittedNo reception on recordRecord updated October 22, 2026

Endicott Bitcoin Mining Pilot is a permitted crypto mining site in Alaska (North Slope County), operated by TA Infrastructure. The public record puts it at 1.4 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Permitted

Operator
TA Infrastructure
Facility type
Crypto mining
Location
North Slope County, AK
Coordinates
70.3267, -148.9433 (approximate)
Power capacity
1.4 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
On site gas
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. December 19, 2024
    Permitted
    Alaska Department of Natural Resources' Division of Oil and Gas approved the land use permit for a trial data center module on the Satellite Drilling Island, per Petroleum News. Source: Petroleum News

Opposition and litigation at this site

Nothing on record as of October 22, 2026. No lawsuit, organized opposition, or contested hearing over Endicott Bitcoin Mining Pilot in North Slope County, Alaska appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Powered by natural gas via Hilcorp's existing on-site generators at the Endicott field.

Notes on the record

Texas-based TA Infrastructure filed a permit application to place Bitcoin-mining computers, collectively drawing 1.4 MW, inside a shipping container on a gravel pad at oil producer Hilcorp's Endicott field on Alaska's North Slope, powered by natural gas from Hilcorp's existing generators. Per the application quoted in the source: "The goal of this pilot project is to demonstrate the ability to operate computers and associated data center infrastructure in the unique environment of the North Slope as well as identify any logistical and operational challenges that a larger project might present." The application named a four-year run with a permit start date of November 2024. Petroleum News reported on 5 January 2025 that the Alaska Department of Natural Resources' Division of Oil and Gas approved the land use permit on 19 December 2024, for a 10-foot by 40-foot module on the Satellite Drilling Island in the Duck Island unit; the division said a fifth year may be used for testing if necessary. As of October 2026, no source found confirms the container was deployed, so status is permitted rather than operational. This is a separate project from the Stak Energy North Slope Data Center record in this dataset (as of September 2026): different named operator, different declared scale (a 1.4 MW pilot container versus a proposal described elsewhere as a "massive AI data center"), and reported about 18 months earlier, not a duplicate. Endicott field's own coordinates could not be resolved: OSM Nominatim's only match for "Endicott" in Alaska was Endicott Arm, a fjord near Juneau over 1,500 km from the North Slope, which was checked and rejected as clearly wrong. The pin used instead is Prudhoe Bay, the nearest well-mapped North Slope hub, as an explicit regional approximation; it is not the specific causeway or gravel-pad location, which could not be geocoded.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Tell us about your situation

Living near Endicott Bitcoin Mining Pilot?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Endicott Bitcoin Mining Pilot data center in North Slope County, Alaska?

Nothing on record as of October 22, 2026. No lawsuit, organized opposition, or contested hearing over Endicott Bitcoin Mining Pilot in North Slope County, Alaska appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Endicott Bitcoin Mining Pilot data center?

No lawsuit over Endicott Bitcoin Mining Pilot appears in the record we track as of October 22, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Endicott Bitcoin Mining Pilot use?

No water withdrawal figure for Endicott Bitcoin Mining Pilot is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Endicott Bitcoin Mining Pilot, and how big is it?

TA Infrastructure is the operator on record. Capacity on record is 1.4 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Endicott Bitcoin Mining Pilot," updated October 22, 2026, https://suedatacenters.org/data-centers/ta-infrastructure-endicott-ak.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ta-infrastructure-endicott-ak, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Arctic Bitcoin? Hilcorp, tech firm aim to test North Slope data center · Alaska Public Media · retrieved September 12, 2026
  2. 2.Testing bitcoin mining · Petroleum News · retrieved September 28, 2026
  3. 3.TA Infrastructure Management, LLC, Duck Island Unit, Satellite Drilling Island Data Center, Land Use Permit (LAS 35307) · Alaska Department of Natural Resources · retrieved September 28, 2026
  4. 4.Arctic Bitcoin? Hilcorp, tech firm aim to test North Slope data center · Anchorage Daily News · retrieved October 18, 2026
  5. 5.State OKs SDI data center land use permit · Petroleum News · retrieved October 21, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us