Data Center Registry
Sanford Woods Data Center
Sanford, York County, Maine
Sanford Woods Data Center is a proposed data center in Sanford, Maine (York County), operated by New England Energy. The public record puts it at announced February 2026. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- New England Energy
- Facility type
- Data center
- Location
- Sanford, York County, ME
- Coordinates
- 43.4387, -70.7746 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- February 2026
- Utility
- Not established from a public source
- Power source
- Mixed
- On site generation
- 300 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Yes. Sanford Woods Data Center in Sanford, York County, Maine is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Sanford imposed a unanimous 91-day emergency moratorium in May 2026, halting the project, then extended it by 180 days to Jan.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
Sanford imposed a unanimous 91-day emergency moratorium in May 2026, halting the project, then extended it by 180 days to Jan. 31, 2027. Developer Randy Gibbs supported the pause. Many residents and the Sanford Clean Water & Air Coalition oppose clearing the 1,000+ acres of woods.
Power and water
Planned to be powered off-grid by on-site generation: a hydrogen fuel-cell plant (initially natural gas, transitioning to hydrogen within ~5 years) plus solar.
Developer stated a maximum of 300,000 gallons/day of water usage for the full campus (not isolated to the data center).
Notes on the record
Reported capacity range is 100-300 MW (not a firm committed figure; not recorded as capacity pending a formal filing). Proposed as one component of the 1,060-acre 'Sanford Woods Industrial and Technical Campus' in south Sanford, bisected by the Mousam River, on land owned since 1975 by the Gibbs family's New England Energy (Randy Gibbs, founder of Multifuels of Houston, TX; co-developer Walt Bussells). Co-located with a planned 300 MW hydrogen fuel-cell power plant (as of October 2026, tracked separately as Sanford Woods Hydrogen Fuel Cell Power Plant), a 50-acre industrial greenhouse, and a cold-storage facility. Cumulative campus investment reported at ~$2.16 billion (a tally by Sanford City Manager Steve Buck, as reported by the Sanford Springvale News) with ~100 long-term jobs for the project as a whole (State Sen. Matthew Harrington's figure, as reported by the same paper) -- both figures span the whole campus, not the data center alone, so they are not recorded as this facility's investment or jobs. No land area is recorded, because the 1,060-acre parcel is the whole campus, not the data center's footprint alone. Disclosed to the Maine Legislature's Energy and Utilities Committee in February 2026; marketing, partner selection, financing and permitting expected to take ~2 years. Maine's 2026 data-center moratorium debate would allow continued groundwork but block new construction permits before 2028.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- University of New Hampshire Data Center (1 Leavitt Lane) · Durham · University of New Hampshire22 mi · Operating
- Scarborough Technology Park (Scarborough High Technology Industrial Park) Data Center · Scarborough · Daniel Dickinson (landowner/developer)24 mi · Proposed · Contested
- FirstLight Portsmouth, NH Data Center · Portsmouth · FirstLight25 mi · Operating
- Liberty Mutual Portsmouth Data Center · Portsmouth · Liberty Mutual26 mi · Operating
- CENTRA Digital Interconnect -- 340 Cumberland (PMW01) · Portland · CENTRA Digital Interconnect30 mi · Operating · 1 MW
Questions people ask about this site
Is there opposition to the Sanford Woods Data Center in Sanford?
Yes. Sanford Woods Data Center in Sanford, York County, Maine is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Sanford imposed a unanimous 91-day emergency moratorium in May 2026, halting the project, then extended it by 180 days to Jan.
Has anyone filed a lawsuit over the Sanford Woods Data Center?
No lawsuit over Sanford Woods Data Center appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Sanford Woods Data Center use?
No water withdrawal figure for Sanford Woods Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Sanford Woods Data Center, and how big is it?
New England Energy is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Sanford Woods Data Center," updated October 28, 2026, https://suedatacenters.org/data-centers/new-england-energy-sanford-woods-dc-me.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/new-england-energy-sanford-woods-dc-me, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Company eyes Sanford site for data center · Sanford Spring Vale News · retrieved October 4, 2026
- 2.Data center could pump $2 billion into city · Sanford Spring Vale News · retrieved October 4, 2026
- 3.Sanford isn't just getting a data center, developer says · Portland Press Herald · retrieved October 22, 2026
- 4.Sanford extends data center moratorium for 180 days · Portland Press Herald · retrieved October 22, 2026
- 5.Sanford imposes emergency data center moratorium, halting Mousam River project · Portland Press Herald · retrieved October 22, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us