Talen Energy Montour Data Center Campus
Washingtonville, Montour County, Pennsylvania · All 2 Talen Energy sites
Talen Energy Montour Data Center Campus is a proposed data center in Washingtonville, Pennsylvania (Montour County), operated by Talen Energy.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Talen Energy
- Facility type
- Data center, AI use likely
- Location
- Washingtonville, Montour County, PA
- Coordinates
- 41.0500, -76.6700 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- On site gas
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 22, 2026ProposedRezoning of roughly 1,000 acres in northern Montour County sought from agricultural to industrial; about a dozen data center buildings anticipated. Source: NorthcentralPA.com
Opposition and litigation at this site
Nothing on record as of August 31, 2026. No lawsuit, organized opposition, or contested hearing over Talen Energy Montour Data Center Campus in Washingtonville, Montour County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Sited beside Talen's Montour plant. DEP published notice in the August 22, 2026 PA Bulletin of an air-quality plan approval application to add two 655 MW turbine generation units at Montour 'to feed A.I. data centers'; comments were due September 21, 2026.
Notes on the record
Talen is seeking to rezone approximately 1,000 acres in northern Montour County from agricultural to industrial; the company anticipates about a dozen buildings, each on two to three acres. Acreage figure is the rezoning request area, not a confirmed campus footprint, so no landAcres value is recorded. The request has drawn substantial local opposition over land use, pollution, water and noise. No tenant has been named.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Muncy Data Center · Muncy · Danko Holdings II14 mi · Permitted · Contested
- 4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3) · Salem Township · 4-3 Glenbrook Group26 mi · Proposed · 3.5 GW
- QTS Salem Township Data Center Campus (Salem 2) · Salem Township · QTS Data Centers26 mi · Proposed
- Nautilus Cryptomine - Building 1 · Berwick (Salem Township) · Talen Energy27 mi · Operating
- AWS Cumulus Data Center Campus, Salem Township · Salem Township · Amazon Web Services28 mi · Under construction · 960 MW · Mixed reception
Questions people ask about this site
Is there opposition to the Talen Energy Montour Data Center Campus in Washingtonville?
Nothing on record as of August 31, 2026. No lawsuit, organized opposition, or contested hearing over Talen Energy Montour Data Center Campus in Washingtonville, Montour County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Talen Energy Montour Data Center Campus?
No lawsuit over Talen Energy Montour Data Center Campus appears in the record we track as of August 31, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Talen Energy Montour Data Center Campus use?
No water withdrawal figure for Talen Energy Montour Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Talen Energy Montour Data Center Campus, and how big is it?
Talen Energy is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Talen Energy Montour Data Center Campus," updated August 31, 2026, https://suedatacenters.org/data-centers/talen-montour-data-center-campus-montour-county-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/talen-montour-data-center-campus-montour-county-pa, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Talen Energy officials address community concerns about rezoning · NorthcentralPA.com · retrieved August 31, 2026
- 2.DEP Invites Comments On Air Permit For Montour CT Natural Gas Power Plant Expansion In Montour County To Feed Data Centers · PA Environment Digest · retrieved August 31, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us