Data Center Registry
Alborz Bitcoin Mine
Happy, Randall County, Texas · All 3 WindHQ sites
Alborz Bitcoin Mine is an operating crypto mining site in Happy, Texas (Randall County), operated by WindHQ LLC / Canaan Inc. The public record puts it at 40 MW operating, a reported $47 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- WindHQ LLC / Canaan Inc.
- Facility type
- Crypto mining
- Location
- Happy, Randall County, TX
- Coordinates
- 35.0120, -101.9165 (approximate)
- Power capacity
- 40 MW operating
- Land
- Not established from a public source
- Investment
- $47 million
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Wind
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 9, 2022OperatingCompleted deployment and operational by Aug 2022 per The Block; still operational as of the Feb 2026 Canaan acquisition, which describes it as part of an operating JV. Source: PR Newswire
Opposition and litigation at this site
Nothing on record as of August 3, 2026. No lawsuit, organized opposition, or contested hearing over Alborz Bitcoin Mine in Happy, Randall County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Wind-powered: substation site within/adjacent to the 163 MW Astra Wind Farm (WindHQ affiliate). $46.9M BlockFi Lending loan financed original construction in 2022 (construction financing, not necessarily total project cost).
Notes on the record
~1.3 EH/s hashrate. Distinct from all nine already-tracked Cipher TX facilities, none of those match Happy/Randall County.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Hut 8 Vega Facility · Amarillo · American Bitcoin (Hut 8)14 mi · Operating · 205 MW
Questions people ask about this site
Is there opposition to the Alborz Bitcoin Mine in Happy?
Nothing on record as of August 3, 2026. No lawsuit, organized opposition, or contested hearing over Alborz Bitcoin Mine in Happy, Randall County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Alborz Bitcoin Mine?
No lawsuit over Alborz Bitcoin Mine appears in the record we track as of August 3, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Alborz Bitcoin Mine use?
No water withdrawal figure for Alborz Bitcoin Mine is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Alborz Bitcoin Mine, and how big is it?
WindHQ LLC / Canaan Inc. is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 40 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Alborz Bitcoin Mine," updated August 3, 2026, https://suedatacenters.org/data-centers/canaan-alborz-happy-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/canaan-alborz-happy-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Canaan Inc. Acquires Cipher Mining's Interest in Multiple Operational Mining Projects Totaling ~4.4 EH/s in West Texas · PR Newswire · retrieved August 3, 2026
- 2.Canaan: Alborz Data Center · Baxtel (data center aggregator) · retrieved August 3, 2026
- 3.Cipher Mining completes 40-megawatt wind powered site in Texas · The Block · retrieved August 3, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us