Data Center Registry
DartPoints Cincinnati
Cincinnati, Hamilton County, Ohio · All 11 DartPoints sites
DartPoints Cincinnati is an operating data center in Cincinnati, Ohio (Hamilton County), operated by DartPoints. The public record puts it at 0.18 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- DartPoints
- Facility type
- Data center
- Location
- 302 W 3rd St, Suite 400, Cincinnati, Hamilton County, OH
- Coordinates
- 39.0980, -84.5173 (approximate)
- Power capacity
- 0.18 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over DartPoints Cincinnati in Cincinnati, Hamilton County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Operator short code CVG01 (PeeringDB: CVG1). Downtown Cincinnati colocation suite; operator states 180 kW critical IT load, 310 tons cooling, 13,200 sq ft data hall (PeeringDB: 14,715 sq ft / 13,408 sq ft data center). Formerly Immedion's, acquired by DartPoints in 2021 per Baxtel. The operator page does not print the street address; it comes from PeeringDB and Baxtel. Coordinates: US Census geocoder match for 302 W 3rd St (address-range interpolation, so approximate).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CyrusOne CIN2 (Cincinnati) · Cincinnati · CyrusOneunder 1 mile · Operating · 14 MW
- H5 Data Centers Cincinnati I · Cincinnati · H5 Data Centersunder 1 mile · Operating
- Lumen Cincinnati 1 (400 Pike Street) · Cincinnati · Lumen Technologiesunder 1 mile · Operating
- H5 Data Centers Cincinnati II · Cincinnati · H5 Data Centers1 mi · Operating · 2 MW
- CyrusOne CIN6 (Florence) · Florence · CyrusOne10 mi · Operating · 5 MW
- Crane Data Centers Pierce Township Campus (near Beckjord) · New Richmond (Pierce Township) · Crane Data Centers14 mi · Proposed · 300 MW · Contested
- Encore Technologies BLU1 (Blue Ash) · Blue Ash · Encore Technologies15 mi · Operating
- Flexential Cincinnati (CIN01/02) · West Chester Township · Flexential15 mi · Operating
Questions people ask about this site
Is there opposition to the DartPoints Cincinnati data center in Cincinnati?
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over DartPoints Cincinnati in Cincinnati, Hamilton County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the DartPoints Cincinnati data center?
No lawsuit over DartPoints Cincinnati appears in the record we track as of October 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does DartPoints Cincinnati use?
No water withdrawal figure for DartPoints Cincinnati is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates DartPoints Cincinnati, and how big is it?
DartPoints is the operator on record. We hold 11 sites for that company across the registry. Capacity on record is 0.18 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "DartPoints Cincinnati," updated October 15, 2026, https://suedatacenters.org/data-centers/dartpoints-cvg01-cincinnati-oh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/dartpoints-cvg01-cincinnati-oh, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.DartPoints CVG01, Cincinnati, OH location page: critical IT load 180 kW, 13,200 sq ft data hall · DartPoints · retrieved October 15, 2026
- 2.PeeringDB facility 3663: DartPoints Cincinnati, OH - CVG1, 302 W 3rd St Ste 400 · PeeringDB · retrieved October 15, 2026
- 3.Baxtel: DartPoints: Cincinnati, OH (CVG01), 302 West 3rd Street, previously operated by Immedion · Baxtel · retrieved October 15, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us