Novva Mesa Data Center Campus is a data center under construction in Mesa, Arizona (Maricopa County), operated by Novva Data Centers. The public record puts it at announced August 2024, 300 MW planned, 160 acres, a reported $3 billion investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Novva Data Centers
- Facility type
- Data center, AI use likely
- Location
- Mesa, Maricopa County, AZ
- Coordinates
- 33.3717, -111.6747
- Power capacity
- 300 MW planned
- Land
- 160 acres
- Investment
- $3 billion
- Announced
- August 2024
- Utility
- Salt River Project (SRP)
- Power source
- Solar
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 200 permanent
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- January 2025Under constructionConstruction underway; Phase 1 (96MW critical IT load) targeting late 2026 opening Source: Novva Data Centers
- August 2024ProposedNovva won 165-acre Mesa state land auction for $62.7M; campus previously filed under name Project Borealis Source: Novva Data Centers
Opposition and litigation at this site
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Novva Mesa Data Center Campus in Mesa, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
100% renewable energy goal; backup generators designed for second-generation biofuel and HVO
The applicant's filed project narrative describes a closed-loop water cooling system (60% water / 40% glycol), filled once at roughly 200,000 gallons per building, with no evaporative or condensing loss and free cooling below 72°F ambient. Novva's press materials describe the same system as 'water-free air-cooling'; the filed engineering description is the more precise source.
Notes on the record
Located near Ellsworth and Warner roads, southeast Mesa. Five data halls, 1.3M sq ft data hall space, 200,000 sq ft office, two-phase buildout over ~10 years. Sixth Novva campus nationally, first in Arizona. Architectural design honors Hohokam heritage. Coordinates approximate. Public-reception check (2026-09-10): Checked Novva's own announcement page (2026-09-10); it markets design amenities ('dedicated acreage offering public pathways for the community') but documents no actual public hearing, resident feedback, or official statement of support/opposition. No community-reception record found in this source.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- How the community has received it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- EdgeCore Mesa Data Center Campus · Mesa · EdgeCore Digital Infrastructure1 mi · Operating · 450 MW · Supported
- EdgeConneX Mesa Campus (PHX11 / 3302 S Hawes Rd) · Mesa · EdgeConneX2 mi · Under construction
- Google Redhawk Mesa Data Center Campus · Mesa · Google3 mi · Operating · 400 MW · Supported
- Meta Mesa Data Center · Mesa · Meta3 mi · Operating · 50 MW
- NTT Phoenix PH1 Data Center · Mesa · NTT Global Data Centers4 mi · Operating · 36 MW
- Apple Mesa Data Center (Global Command Center) · Mesa · Apple4 mi · Operating
- NTT Global Data Centers Mesa, Pacific Proving Technology Park · Mesa · NTT Global Data Centers6 mi · Proposed · 360 MW · Contested
- Centersquare PHX3 · Mesa · Centersquare (Cyxtera/Evoque)11 mi · Operating · 17.3 MW
Questions people ask about this site
Is there opposition to the Novva Mesa Data Center Campus in Mesa?
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Novva Mesa Data Center Campus in Mesa, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Novva Mesa Data Center Campus?
No lawsuit over Novva Mesa Data Center Campus appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Novva Mesa Data Center Campus use?
No water withdrawal figure for Novva Mesa Data Center Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Novva Mesa Data Center Campus, and how big is it?
Novva Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 300 MW. The site is recorded at 160 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Novva Mesa Data Center Campus," updated September 10, 2026, https://suedatacenters.org/data-centers/novva-mesa-az.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/novva-mesa-az, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Novva Data Centers Announces New Campus in Mesa · Novva Data Centers · retrieved July 6, 2026
- 2.Novva confirmed as behind Project Borealis data center campus in Phoenix · Data Center Dynamics · retrieved July 6, 2026
- 3.City of Mesa case ZON24-00291 ('Project Borealis') Project Narrative, 'Each of the data hall buildings will utilize a closed-loop water cooling system... Crucially, no evaporative methods are used for reducing air temperature' · retrieved August 31, 2026
- 4.City of Mesa Planning Division staff report, ZON24-00291, 'Site Size: 159± acres', parcel 304-31-141 · retrieved August 31, 2026
- 5.Novva Data Centers Announces New Campus in Mesa · PR Newswire / Novva Data Centers · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us