Project Cornmaze Data Center (Town of Beloit)
Beloit, Rock County, Wisconsin
Project Cornmaze Data Center (Town of Beloit) is a proposed data center in Beloit, Wisconsin (Rock County), operated by Cambrin LLC. The public record puts it at announced July 15, 2025, 430 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Cambrin LLC
- Facility type
- Data center
- Location
- Beloit, Rock County, WI
- Coordinates
- 42.5844, -89.0216 (approximate)
- Power capacity
- Not established from a public source
- Land
- 430 acres
- Investment
- Not established from a public source
- Announced
- July 15, 2025
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 15, 2025ProposedTown of Beloit signed a pre-development agreement with Cambrin LLC covering rezoning, a development agreement and possible tax increment financing; Cambrin agreed to reimburse the town up to $175,000 in costs. Source: Wisconsin Public Radio
Opposition and litigation at this site
Nothing on record as of August 18, 2026. No lawsuit, organized opposition, or contested hearing over Project Cornmaze Data Center (Town of Beloit) in Beloit, Rock County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
430 acres at an existing gravel pit on the northeast side of the Town of Beloit, along Town Line Road, South Prairie Avenue and East Philhower Road; property currently owned by Rock Road Companies Inc. Very preliminary, a sewer and water study is underway, no site plans or applications filed, land not yet purchased. Cambrin LLC is a Delaware entity; DNR filings share a contact name and email with Degas LLC, the entity Meta used for Beaver Dam, but Meta has not confirmed involvement, so the operator is recorded as Cambrin only. Coordinates geocode Town Line Road.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- APECS Data Center Campus (Former GM Assembly Plant) · Janesville · Viridian Acquisitions LLC5 mi · Proposed · 800 MW · Contested
Questions people ask about this site
Is there opposition to the Project Cornmaze Data Center (Town of Beloit) in Beloit?
Nothing on record as of August 18, 2026. No lawsuit, organized opposition, or contested hearing over Project Cornmaze Data Center (Town of Beloit) in Beloit, Rock County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Project Cornmaze Data Center (Town of Beloit)?
No lawsuit over Project Cornmaze Data Center (Town of Beloit) appears in the record we track as of August 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Project Cornmaze Data Center (Town of Beloit) use?
No water withdrawal figure for Project Cornmaze Data Center (Town of Beloit) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Project Cornmaze Data Center (Town of Beloit), and how big is it?
Cambrin LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 430 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Project Cornmaze Data Center (Town of Beloit)," updated August 18, 2026, https://suedatacenters.org/data-centers/cambrin-project-cornmaze-town-of-beloit-wi.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cambrin-project-cornmaze-town-of-beloit-wi, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Town of Beloit has pre-development agreement with company looking to develop data center · Wisconsin Public Radio · retrieved August 18, 2026
- 2.The Rock County data center fight, Cambrin/Beloit quarry site · 608 Scanner · retrieved August 18, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us