CleanSpark Clinton Bitcoin Mining Facilities

Clinton, Hinds County, Mississippi · All 25 CleanSpark sites

OperatingNo reception on recordAI confirmedRecord updated September 9, 2026

CleanSpark Clinton Bitcoin Mining Facilities is an operating crypto mining site in Clinton, Mississippi (Hinds County), operated by CleanSpark, Inc. The public record puts it at announced September 17, 2024, 16.5 MW operating, a reported $6 million investment.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
CleanSpark, Inc.
Facility type
Crypto mining, AI use confirmed
Location
Industrial Park Drive, Clinton, Hinds County, MS
Coordinates
32.3561, -90.3635 (representative_multi_site)
Power capacity
16.5 MW operating
Land
Not established from a public source
Investment
$6 million
Announced
September 17, 2024
Utility
Entergy Mississippi
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. December 2024
    Operating
    CleanSpark reported the two Clinton facilities were completed December 2, 2024 and expected to be operational by December 6, 2024. Source: Mississippi Independent
  2. September 17, 2024
    Under construction
    CleanSpark announced the acquisition of 'two Bitcoin mining sites and associated land near Clinton, Mississippi' for a combined $5.775 million supporting 16.5 MW; the sites were partially complete and the price included the cost to finish site infrastructure, with expected completion December 1, 2024. Source: U.S. Securities and Exchange Commission (EDGAR)

Opposition and litigation at this site

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over CleanSpark Clinton Bitcoin Mining Facilities in Clinton, Hinds County, Mississippi appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Utility identified by the Mississippi Independent, which observed Entergy connecting prefabricated mining pods to power lines at the sites in late November 2024. CleanSpark's own 8-K does not name a utility.

Notes on the record

Net-new: the dataset records three CleanSpark Mississippi sites (Meridian, Vicksburg, Wiggins), all traced to the February 2024 three-site purchase. These Clinton sites are a SEPARATE, later transaction, announced 2024-09-17, and appear in no existing MS record. Deliberately filed as ONE record covering TWO adjacent sites: CleanSpark's 8-K says only 'two Bitcoin mining sites and associated land near Clinton, Mississippi' without naming them, and the Mississippi Independent locates them as 'one on Industrial Park Drive near railroad tracks; another on I-20 frontage road near power line right-of-way' in the Clinton Industrial Park, Hinds County. The coordinates are an OpenStreetMap geocode of Industrial Park Drive, Clinton, a real road named by source 1, and precision is 'representative_multi_site' because the record stands for both parcels; the I-20 frontage parcel has no geocodable address in any source fetched here. SPLIT IT into two records only if a parcel-level source for the second site turns up. capacityMw.operational 16.5 is the combined figure the 8-K states for both sites together ('support a total of 16.5 MW'), as is the $5.775M. Hashrate ~1 EH/s on S21 pro miners is stated but the schema has no hashrate field. Confirmed absences: no fetched source states a fee-in-lieu or other incentive for these sites, no job count, no water use, and no acreage; the Mississippi Independent notes CleanSpark's initial announcement 'did not specify the precise locations' and that the company declined detailed comment. Adjacency note: Amazon's $1B Clinton data center (record aws-clinton-hinds-ms in this artifact) is in the same Clinton Industrial Park, same park, different operator and different facility.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the CleanSpark Clinton Bitcoin Mining Facilities data center in Clinton?

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over CleanSpark Clinton Bitcoin Mining Facilities in Clinton, Hinds County, Mississippi appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the CleanSpark Clinton Bitcoin Mining Facilities data center?

No lawsuit over CleanSpark Clinton Bitcoin Mining Facilities appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does CleanSpark Clinton Bitcoin Mining Facilities use?

No water withdrawal figure for CleanSpark Clinton Bitcoin Mining Facilities is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates CleanSpark Clinton Bitcoin Mining Facilities, and how big is it?

CleanSpark, Inc. is the operator on record. We hold 25 sites for that company across the registry. Capacity on record is 16.5 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "CleanSpark Clinton Bitcoin Mining Facilities," updated September 9, 2026, https://suedatacenters.org/data-centers/cleanspark-clinton-ms.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cleanspark-clinton-ms, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.CleanSpark, Inc. Form 8-K Exhibit 99.1, CleanSpark Acquires Two Additional Sites in Mississippi and Closes Second Site in Wyoming · U.S. Securities and Exchange Commission (EDGAR) · retrieved September 9, 2026
  2. 2.Channeling cryptocurrency in a Mississippi industrial park · Mississippi Independent · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us