CLT-01 Campus (One Blockchain Spartanburg) is an operating data center in Moore, South Carolina (Spartanburg County), operated by AIB Data Centers Inc. (One Blockchain LLC). The public record puts it at 65 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- AIB Data Centers Inc. (One Blockchain LLC)
- Facility type
- Data center, AI use mixed
- Location
- Moore, Spartanburg County, SC
- Coordinates
- 34.8549, -82.0127 (approximate)
- Power capacity
- 40 MW operating; 65 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 13, 2026Operating10-Q describes an existing 40 MW facility generating substantially all revenue from bitcoin hosting, now being repurposed as the ~65 MW CLT-01 AI/HPC campus. Source: U.S. Securities and Exchange Commission (EDGAR)
Opposition and litigation at this site
Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over CLT-01 Campus (One Blockchain Spartanburg) in Moore, Spartanburg County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Operated by One Blockchain LLC, wholly owned by AIB Data Centers Inc. (NYSE American: AIB; renamed from BlockchAIn Digital Infrastructure on 2026-06-25). The 10-Q states an existing 40 MW facility on leased land in Spartanburg County being repurposed into the ~65 MW CLT-01 AI/HPC campus via project entity AIB CLT1 LLC (formed 2026-06-23); revenue today is bitcoin hosting, hence aiClassification mixed_use. Baxtel reports the address as 389 Tyger River Industrial Drive; that address is NOT in the SEC filing, so it is recorded here only as a note and the coordinate is the Tyger River Industrial Drive road centroid (approximate, not parcel-confirmed). Same industrial park as the cancelled TigerDC Project Spero record but a different operator and a different, already-built facility.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Project Spero (TigerDC), Tyger River Industrial Park · TigerDC6 mi · Cancelled
- Greenidge Spartanburg (South Carolina) · Spartanburg · Greenidge Generation8 mi · Cancelled · 100 MW
- DartPoints Spartanburg Data Center (SPA01) · Spartanburg · DartPoints10 mi · Operating · 1.6 MW
- NorthMark Strategies Spartanburg High-Performance Computing Center · Spartanburg · Valara Holdings (NorthMark Strategies)10 mi · Under construction · 450 MW
- LightHouse Data Centers Spartanburg (300 Jones Road) · Spartanburg · LightHouse Data Centers (The Lightstone Group)13 mi · Proposed · 60 MW
- Resilience GSP · Greer · Overwatch Capital17 mi · Under construction
- DartPoints Greenville Data Center · Greenville · DartPoints19 mi · Operating · 12.5 MW · Supported
- Project Alpaca (Midway Green Industrial Park) · Union · Volt Edge Energy22 mi · Proposed · 49 MW · Contested
Questions people ask about this site
Is there opposition to the CLT-01 Campus (One Blockchain Spartanburg) in Moore?
Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over CLT-01 Campus (One Blockchain Spartanburg) in Moore, Spartanburg County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the CLT-01 Campus (One Blockchain Spartanburg)?
No lawsuit over CLT-01 Campus (One Blockchain Spartanburg) appears in the record we track as of September 22, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does CLT-01 Campus (One Blockchain Spartanburg) use?
No water withdrawal figure for CLT-01 Campus (One Blockchain Spartanburg) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates CLT-01 Campus (One Blockchain Spartanburg), and how big is it?
AIB Data Centers Inc. (One Blockchain LLC) is the operator on record. Capacity on record is 65 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "CLT-01 Campus (One Blockchain Spartanburg)," updated September 22, 2026, https://suedatacenters.org/data-centers/aib-clt-01-spartanburg-county-sc.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aib-clt-01-spartanburg-county-sc, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.AIB Data Centers Inc. Form 10-Q for the quarter ended 2026-06-30 · U.S. Securities and Exchange Commission (EDGAR) · retrieved September 22, 2026
- 2.Baxtel, BlockchAIn: Spartanburg, SC data center · Baxtel · retrieved September 22, 2026
- 3.dcmap.us, South Carolina data center map (One BlockchAIn Spartanburg, Moore, operational) · dcmap.us · retrieved September 22, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us