Project Spero (TigerDC), Tyger River Industrial Park is a cancelled data center in South Carolina (Spartanburg County), operated by TigerDC.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
TigerDC
Facility type
Data center
Location
Spartanburg County, SC
Coordinates
34.9109, -82.0926 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. February 28, 2026
    Cancelled
    TigerDC formally withdrew Project Spero from consideration in Spartanburg County after the council declined to offer tax incentives, stating that 'alignment has not been achieved' and that it would pursue alternative sites. Source: FOX Carolina
  2. November 2025
    Proposed
    Spartanburg County Council adopted a resolution backing the project in November 2025. Source: FOX Carolina

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Spero (TigerDC), Tyger River Industrial Park in Spartanburg County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

TigerDC described a self-contained power strategy designed to avoid straining the local residential grid.

TigerDC documentation described a closed-loop cooling system with negligible water impact.

Notes on the record

Proposed for Tyger River Industrial Park-North in Spartanburg County. Local coverage put the investment at roughly $3 billion, but the fetched source describes it only as 'multibillion-dollar', so no investment figure is asserted here. Coordinates are an approximate geocode of the Tyger River Industrial Park area. Distinct from both the tracked Greenidge Spartanburg record and the NorthMark/Valara site. Re-checked 2026-09-10: 'cancelled' status remains accurate. TigerDC formally withdrew Project Spero on 2026-02-27 after Spartanburg County Council declined to offer a tax incentive amid sustained public opposition; TigerDC said it will look at other, more receptive communities but no replacement SC site has been named.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Project Spero (TigerDC), Tyger River Industrial Park data center in Spartanburg County, South Carolina?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Spero (TigerDC), Tyger River Industrial Park in Spartanburg County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Project Spero (TigerDC), Tyger River Industrial Park data center?

No lawsuit over Project Spero (TigerDC), Tyger River Industrial Park appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Project Spero (TigerDC), Tyger River Industrial Park use?

No water withdrawal figure for Project Spero (TigerDC), Tyger River Industrial Park is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Project Spero (TigerDC), Tyger River Industrial Park, and how big is it?

TigerDC is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Spero (TigerDC), Tyger River Industrial Park," updated September 10, 2026, https://suedatacenters.org/data-centers/tigerdc-project-spero-spartanburg-county-sc.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/tigerdc-project-spero-spartanburg-county-sc, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Company withdraws AI data center from Spartanburg County consideration · FOX Carolina · retrieved August 26, 2026
  2. 2.OpenStreetMap Nominatim geocode for Tyger River Industrial Park area, Spartanburg County, SC · OpenStreetMap · retrieved August 26, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us