ETC DC OpCo Lysite Data Center ("1 MW DC Site")

Lysite, Fremont County, Wyoming

ProposedNo reception on recordRecord updated September 14, 2026

ETC DC OpCo Lysite Data Center ("1 MW DC Site") is a proposed data center in Lysite, Wyoming (Fremont County), operated by ETC DC OpCo LLC. The public record puts it at announced July 15, 2026.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
ETC DC OpCo LLC
Facility type
Data center
Location
Lysite, Fremont County, WY
Coordinates
43.2850, -107.6360 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
July 15, 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. August 19, 2026
    Proposed
    WDEQ Air Quality Division issued a proposed approval of the 2026-07-15 permit application; public comment open through 2026-09-14. Fremont County has no countywide zoning, so no county land-use permit is required. Source: Cowboy State Daily

Opposition and litigation at this site

Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over ETC DC OpCo Lysite Data Center ("1 MW DC Site") in Lysite, Fremont County, Wyoming appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Permit application covers eight Mesa Power Solutions GV22 PowerCore natural-gas-fired emergency generator engines rated 604 horsepower each (4,832 hp total), each limited to 100 hours of non-emergency operation per year with non-resettable hour meters, which WDEQ treats as best available control technology.

Notes on the record

Site is about three miles east-northeast of Lysite in unincorporated eastern Fremont County, near the Lost Cabin Gas Plant. The application documents label the project the "1 MW DC Site"; the DEQ analysis does not explain whether that designation is the anticipated electrical demand or another measure, so no capacity is recorded here. Footprint, acreage and water use are not disclosed in available records. Coordinates are a geocode from the published distance-and-bearing description and are not a parcel-confirmed point.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Free case review

Living near ETC DC OpCo Lysite Data Center ("1 MW DC Site")?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the ETC DC OpCo Lysite Data Center ("1 MW DC Site") in Lysite?

Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over ETC DC OpCo Lysite Data Center ("1 MW DC Site") in Lysite, Fremont County, Wyoming appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the ETC DC OpCo Lysite Data Center ("1 MW DC Site")?

No lawsuit over ETC DC OpCo Lysite Data Center ("1 MW DC Site") appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does ETC DC OpCo Lysite Data Center ("1 MW DC Site") use?

No water withdrawal figure for ETC DC OpCo Lysite Data Center ("1 MW DC Site") is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates ETC DC OpCo Lysite Data Center ("1 MW DC Site"), and how big is it?

ETC DC OpCo LLC is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "ETC DC OpCo Lysite Data Center ("1 MW DC Site")," updated September 14, 2026, https://suedatacenters.org/data-centers/etc-dc-opco-lysite-fremont-county-wy.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/etc-dc-opco-lysite-fremont-county-wy, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Plan For Data Center Puts Spotlight On Lax Fremont County Zoning Laws · Cowboy State Daily · retrieved September 14, 2026
  2. 2.Details emerge on Lysite data center · Riverton Ranger · retrieved September 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us