Greenlin Park
Leesburg, Loudoun County, Virginia · All 2 JK Land Holdings sites
Greenlin Park is a permitted data center in Leesburg, Virginia (Loudoun County), operated by JK Land Holdings. The public record puts it at announced July 2024, 300 MW planned, 83 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- JK Land Holdings
- Facility type
- Data center
- Location
- Leesburg, Loudoun County, VA
- Coordinates
- 39.0640, -77.5240 (approximate)
- Power capacity
- 300 MW planned
- Land
- 83 acres
- Investment
- Not established from a public source
- Announced
- July 2024
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 19, 2025PermittedThe Loudoun County Board of Supervisors approved the rezoning 5-4 on February 19, 2025, changing the site from Transitional Residential-10 and Joint Land Management Area-20 to Industrial Park. Source: Loudoun Now
Opposition and litigation at this site
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Greenlin Park in Leesburg, Loudoun County, Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
1.4 million sq ft of data center and utility substation use on 83 acres south of Leesburg, on the west side of Sycolin Road bounded by Shreve Mill Road and the Dulles Greenway; property owned by Chuck Kuhn through JK Land Holdings. Originally proposed at 2.1 million sq ft; scaled back after opposition at a September 2024 public hearing. Approval limits power draw to 300MW for five years and building height to 55 feet, and requires upgraded generators, added screening and noise limits, stormwater mitigation, water-use restrictions, and three years of energy-use monitoring and reporting.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Compass Datacenters Loudoun County I ("True North") · Leesburg · Compass Datacenters2 mi · Operating
- Cross Mill Center · Leesburg · JK Land Holdings2 mi · Permitted · Contested
- Equinix Ashburn Campus (DC1-DC15) · Ashburn · Equinix2 mi · Operating · 500 MW · Mixed reception
- STACK NVA Loudoun 144MW Hyperscale Campus · Ashburn · STACK Infrastructure2 mi · Permitted · 144 MW
- Bridgefield Tech Center · Ashburn · Amazon Web Services4 mi · Proposed
- Spring Valley Technology Park · Ashburn · Active Infrastructure4 mi · Proposed
- NTT Ashburn VA8 Data Center · Ashburn · NTT Global Data Centers4 mi · Operating
- Sabey Intergate.Ashburn (Building A) · Ashburn · Sabey Data Centers4 mi · Under construction · 54 MW
Questions people ask about this site
Is there opposition to the Greenlin Park data center in Leesburg?
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Greenlin Park in Leesburg, Loudoun County, Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Greenlin Park data center?
No lawsuit over Greenlin Park appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Greenlin Park use?
No water withdrawal figure for Greenlin Park is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Greenlin Park, and how big is it?
JK Land Holdings is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 300 MW. The site is recorded at 83 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Greenlin Park," updated September 9, 2026, https://suedatacenters.org/data-centers/jk-land-greenlin-park-leesburg-va.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/jk-land-greenlin-park-leesburg-va, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.300 MW Data Center Approved South of Leesburg · Loudoun Now · retrieved September 9, 2026
- 2.Data Centers in Loudoun: A Primer · The Piedmont Environmental Council · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us