Flexential Kaufman County Campus (Talty)
Talty, Kaufman County, Texas · All 46 Flexential sites
Flexential Kaufman County Campus (Talty) is a proposed data center in Talty, Texas (Kaufman County), operated by Flexential. The public record puts it at announced July 28, 2026, 108 MW planned, 110 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Flexential
- Facility type
- Data center
- Location
- Talty, Kaufman County, TX
- Coordinates
- 32.6890, -96.3378 (approximate)
- Power capacity
- 108 MW planned
- Land
- 110 acres
- Investment
- Not established from a public source
- Announced
- July 28, 2026
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 25, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Kaufman County Campus (Talty) in Talty, Kaufman County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Fourth and largest Flexential North Texas campus; phase 1 is a 375,000 sq ft, 36MW building with room for two more 36MW buildings (108MW full build-out). Site work targeted early 2027; first customers late 2028. Distinct site from Flexential's existing Dallas Downtown/Plano/Richardson facilities already tracked.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Prometheus Hyperscale Kaufman County Campus · Prometheus Hyperscale3 mi · Proposed · 200 MW
- Telios Quinlan Campus · Quinlan · Core Scientific19 mi · Proposed · 430 MW · Contested
- STACK DFW02 (Lancaster) · Lancaster · STACK Infrastructure25 mi · Under construction · 500 MW
- Red Oak Campus · Red Oak · DataBank26 mi · Under construction · 480 MW
- Crow Holdings Stemmons Corridor Data Center Campus · Dallas · Crow Holdings (developed and leased by CleanArc Data Centers)27 mi · Proposed · 245 MW
- NTT Global Data Centers Dallas TX1 · Garland · NTT Global Data Centers27 mi · Operating
- Stream Data Centers DFWA (DFW VII) · Garland · Stream Data Centers27 mi · Operating · 43 MW
- Flexential Dallas - Downtown Dallas · Dallas · Flexential29 mi · Operating
Questions people ask about this site
Is there opposition to the Flexential Kaufman County Campus (Talty) in Talty?
Nothing on record as of August 25, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Kaufman County Campus (Talty) in Talty, Kaufman County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Flexential Kaufman County Campus (Talty)?
No lawsuit over Flexential Kaufman County Campus (Talty) appears in the record we track as of August 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Flexential Kaufman County Campus (Talty) use?
No water withdrawal figure for Flexential Kaufman County Campus (Talty) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Flexential Kaufman County Campus (Talty), and how big is it?
Flexential is the operator on record. We hold 46 sites for that company across the registry. Capacity on record is 108 MW. The site is recorded at 110 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Flexential Kaufman County Campus (Talty)," updated August 25, 2026, https://suedatacenters.org/data-centers/flexential-kaufman-county-talty-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/flexential-kaufman-county-talty-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Flexential to Build New Dallas-Area Data Center Campus on 110 Acres in Kaufman County · PR Newswire · retrieved August 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us