Data Center Registry
365 Data Centers Long Island (Commack)
Commack, Suffolk County, New York · All 6 365 Data Centers sites
365 Data Centers Long Island (Commack) is an operating data center in Commack, New York (Suffolk County), operated by 365 Data Centers. The public record puts it at 6 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- 365 Data Centers
- Facility type
- Data center
- Location
- 500 Commack Road, Commack, Suffolk County, NY, 11725
- Coordinates
- 40.8242, -73.2929 (approximate)
- Power capacity
- 6 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 4, 2020Operating365 Data Centers completed the acquisition of the Commack, Long Island data center from mindSHIFT Technologies; the Tier III facility was constructed in 2016 and was already operating at acquisition. Source: 365 Data Centers (via PR Newswire)
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Long Island (Commack) in Commack, Suffolk County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
24,000 sq ft across two pods, Tier III, constructed 2016. The acquisition announcement states 3 MW immediately available out of 6 MW total utility power and generator capacity; capacityMw.operational records that 6 MW figure, which is utility-plus-generator capacity rather than a measured IT load. Coordinates are a street-address geocode (two OSM address points exist at this address ~110 m apart), hence precision "approximate".
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Long Island Interconnect (formerly 1025Connect) · Westbury · Long Island Interconnect, LLC (formerly 1025Connect)15 mi · Operating
- Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank) · Yaphank · WF Industrial (Wildflower)19 mi · Proposed · 176.6 MW · Contested
- CyrusOne NYM5 (Norwalk) · Norwalk · CyrusOne21 mi · Operating · 4 MW
- Omega Systems Stamford Data Center (26 Fahey Street, formerly Amnet/Cloudpath CT1) · Stamford · Omega Systems22 mi · Operating
- CogNovum Data Center (80 Merritt Boulevard) · Trumbull · CogNovum30 mi · Operating · 6.75 MW · Contested
Questions people ask about this site
Is there opposition to the 365 Data Centers Long Island (Commack) data center in Commack?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Long Island (Commack) in Commack, Suffolk County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the 365 Data Centers Long Island (Commack) data center?
No lawsuit over 365 Data Centers Long Island (Commack) appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does 365 Data Centers Long Island (Commack) use?
No water withdrawal figure for 365 Data Centers Long Island (Commack) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates 365 Data Centers Long Island (Commack), and how big is it?
365 Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 6 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "365 Data Centers Long Island (Commack)," updated September 14, 2026, https://suedatacenters.org/data-centers/365-data-centers-commack-ny.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/365-data-centers-commack-ny, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Commack, 365 Data Centers (operator facility page, 500 Commack Rd, Commack, NY 11725) · 365 Data Centers · retrieved September 14, 2026
- 2.365 Data Centers Acquires Commack, Long Island Data Center from mindSHIFT Technologies · 365 Data Centers (via PR Newswire) · retrieved September 14, 2026
- 3.OpenStreetMap/Nominatim geocode of 500 Commack Road, Commack, NY 11725 · OpenStreetMap contributors · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us