AWS Hayden Run Campus is an operating data center in Hilliard, Ohio (Franklin County), operated by Amazon Web Services. The public record puts it at announced 2015, 55.22 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Amazon Web Services
Facility type
Data center, AI use likely
Location
Hilliard, Franklin County, OH
Coordinates
40.0599, -83.1343
Power capacity
Not established from a public source
Land
55.22 acres
Investment
Not established from a public source
Announced
2015
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. 2018
    Operating
    First building completed ~2018 (AWS's first Ohio region facility, ground broken 2015) per data-center directories; Franklin County Auditor records the parcel with land-use class 'data center' and 768,498 sq ft of assessed building area (built). Source: Baxtel

Opposition and litigation at this site

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over AWS Hayden Run Campus in Hilliard, Franklin County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Hayden Run (5109 Hayden Run Rd, Hilliard) is AWS's original Hilliard campus (construction began 2015). The PUCO-approved 73MW Bloom Energy fuel-cell project (228 SOFC units) is confirmed sited at 4120 Scioto Darby Creek Rd, AWS's third, separate Hilliard campus at Scioto Darby Rd/I-270, not at Hayden Run.

Notes on the record

AWS's first US East (Ohio) region data center, a ~55-acre Vadata Inc campus at 5109-5129 Hayden Run Rd, Hilliard. Broke ground 2015; first building completed ~2018; a multi-building campus that has continued expanding. Franklin County Auditor land-use class 'data center' with 768,498 sq ft of assessed building area (= built/operational); owner Vadata Inc (Amazon's data-center subsidiary). Data-center directories (DC Byte / baxtel) list several numbered Hayden Run buildings (5109/5113/5117/5121/5125) that correspond to buildings within this single county parcel, not separate sites. No site-specific IT-load MW is disclosed. Coordinates are the Franklin County Auditor parcel centroid. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (also Hilliard, Franklin County).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the AWS Hayden Run Campus in Hilliard?

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over AWS Hayden Run Campus in Hilliard, Franklin County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the AWS Hayden Run Campus?

No lawsuit over AWS Hayden Run Campus appears in the record we track as of July 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does AWS Hayden Run Campus use?

No water withdrawal figure for AWS Hayden Run Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates AWS Hayden Run Campus, and how big is it?

Amazon Web Services is the operator on record. We hold 54 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 55.22 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "AWS Hayden Run Campus," updated July 24, 2026, https://suedatacenters.org/data-centers/aws-hayden-run-hilliard-oh.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aws-hayden-run-hilliard-oh, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Franklin County Auditor parcel/GIS record (parcel 050-011444, 5109-5129 Hayden Run Rd, VADATA INC, land-use class 'data center', assessed building area 768,498 sq ft = built, 55.2 ac) · Franklin County Auditor GIS / Assessor · retrieved July 19, 2026
  2. 2.Amazon Hilliard 5109 Hayden Run, AWS's first US East (Ohio) region data center; broke ground 2015, built ~2018, fully operational, multi-building campus · Baxtel · retrieved July 19, 2026
  3. 3.AWS plans third data center campus in Hilliard, Ohio (DCD) · retrieved July 24, 2026
  4. 4.Fuel Cells, City of Hilliard · retrieved July 24, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us