Sue Data Centers

Data Center Registry

Aligned PHX-01/02/03

Phoenix, Maricopa County, Arizona · All 22 Aligned Data Centers sites

OperatingNo reception on recordAI likelyRecord updated September 2, 2026

Aligned PHX-01/02/03 is an operating data center in Phoenix, Arizona (Maricopa County), operated by Aligned Data Centers. The public record puts it at 55 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Aligned Data Centers
Facility type
Data center, AI use likely
Location
Phoenix, Maricopa County, AZ
Coordinates
33.6591, -112.1112
Power capacity
Not established from a public source
Land
55 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Arizona Public Service (APS)
Power source
On site gas
On site generation
63 MW
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of September 2, 2026. No lawsuit, organized opposition, or contested hearing over Aligned PHX-01/02/03 in Phoenix, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Aligned's Phoenix campus (2500 W Union Hills, matches PHX-01/02/03) is powered by APS via a custom 69kV enhanced-capability substation, PLUS a genuine 63 MW on-site microgrid generation project built jointly with APS, allowing the campus to island itself from the grid during congestion.

Notes on the record

Confirmed operational via Aligned's Phoenix directory page; 55-acre Union Hills campus, PHX-01/02/03/05 buildings. AI/HPC (likely): Phoenix hosts Aligned Advanced Cooling Lab; DeltaFlow supports highest-density GPUs.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Aligned PHX-01/02/03 data center in Phoenix?

Nothing on record as of September 2, 2026. No lawsuit, organized opposition, or contested hearing over Aligned PHX-01/02/03 in Phoenix, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Aligned PHX-01/02/03 data center?

No lawsuit over Aligned PHX-01/02/03 appears in the record we track as of September 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Aligned PHX-01/02/03 use?

No water withdrawal figure for Aligned PHX-01/02/03 is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Aligned PHX-01/02/03, and how big is it?

Aligned Data Centers is the operator on record. We hold 22 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 55 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Aligned PHX-01/02/03," updated September 2, 2026, https://suedatacenters.org/data-centers/aligned-phx-01-02-03-az.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aligned-phx-01-02-03-az, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Aligned facility directory · Aligned · retrieved July 22, 2026
  2. 2.OpenStreetMap way/155739337 · OpenStreetMap · retrieved July 22, 2026
  3. 3.DCD, Phoenix data center will have 63MW on-site generation · retrieved July 24, 2026
  4. 4.Aligned, Power Reliability is a Big Driver for Aligned Data Centers in Phoenix · retrieved July 24, 2026
  5. 5.Aligned facility directory · Aligned · retrieved September 2, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us