Sue Data Centers

Data Center Registry

Equinix NY3

Secaucus, Hudson County, New Jersey · All 38 Equinix sites

OperatingNo reception on recordRecord updated October 9, 2026

Equinix NY3 is an operating data center in Secaucus, New Jersey (Hudson County), operated by Equinix.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Equinix
Facility type
Data center
Location
600 Jefferson Avenue, Secaucus, Hudson County, NJ
Coordinates
40.7742, -74.0659 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. October 9, 2026
    Operating
    Baxtel lists Equinix NY3 (600 Jefferson Ave, Secaucus) as operational: 'Phase 1 is live with about 1,200 cabinets; the full site is planned for roughly 5,050 cabinets', first built in 2025 with expansions through 2027. DatacenterHawk's listing is internally inconsistent (under construction, but tagged commissioned), so this rests on one aggregator. Verify against Equinix before approving. Source: Baxtel

Opposition and litigation at this site

Nothing on record as of October 9, 2026. No lawsuit, organized opposition, or contested hearing over Equinix NY3 in Secaucus, Hudson County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Data Center Frontier (retrieved 2026-09-12): 'NY3, a new 300,000 sq ft facility, is under construction on the Secaucus campus,' first phase supporting roughly 1,200 colocation cabinets at 9-10 kW average density, described there as Equinix's largest planned NY-metro site. The record is listed as under construction on that basis; however, as of September 2026, Inflect's listing for the same address already shows marketed/usable leasing space figures, so this facility may have since opened or begun partial delivery. The facility is not asserted as still under construction today.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Equinix NY3?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Equinix NY3 data center in Secaucus?

Nothing on record as of October 9, 2026. No lawsuit, organized opposition, or contested hearing over Equinix NY3 in Secaucus, Hudson County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Equinix NY3 data center?

No lawsuit over Equinix NY3 appears in the record we track as of October 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Equinix NY3 use?

No water withdrawal figure for Equinix NY3 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Equinix NY3, and how big is it?

Equinix is the operator on record. We hold 38 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Equinix NY3," updated October 9, 2026, https://suedatacenters.org/data-centers/equinix-ny3-secaucus-nj.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/equinix-ny3-secaucus-nj, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Equinix NY5, NY11 Data Centers Generate Digital, Economic Magnetism in NY-NJ · Data Center Frontier · retrieved September 12, 2026
  2. 2.Equinix NY3 to 600 Jefferson Avenue, Secaucus · Inflect · retrieved September 12, 2026
  3. 3.Equinix: NY3 (facility listing) · Baxtel · retrieved October 9, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us