Black Horse Pike Data Center (3043 Black Horse Pike)

Monroe Township, Gloucester County, New Jersey

CancelledIn litigationRecord updated September 14, 2026

Black Horse Pike Data Center (3043 Black Horse Pike) is a cancelled data center in Monroe Township, New Jersey (Gloucester County), operated by Hexa Builders. It is or has been the subject of litigation over its siting, permitting, or operation.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
Hexa Builders
Facility type
Data center
Location
3043 Black Horse Pike, Monroe Township, Gloucester County, NJ, 08094
Coordinates
39.7005, -75.0041 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
In litigation
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. May 2026
    Cancelled
    Application rejected as incomplete in May 2026, after Monroe Township adopted a township-wide data center ban on 22 April 2026. Source: Jersey Vindicator

Opposition and litigation at this site

Yes. Black Horse Pike Data Center (3043 Black Horse Pike) in Monroe Township, Gloucester County, New Jersey is or has been the subject of litigation over its siting, permitting, or operation. Hexa filed a 104-page, 20-count suit on 5 June 2026 seeking a declaration that the ban is unconstitutional, reversal of the planning board's rejection and $300 million in damages.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.

Hexa filed a 104-page, 20-count suit on 5 June 2026 seeking a declaration that the ban is unconstitutional, reversal of the planning board's rejection and $300 million in damages. The case was removed to the U.S. District Court for the District of New Jersey in Camden on 6 July 2026 (Civil Action No. 26-cv-08284-ESK-EAP); the township moved to dismiss on 28 July 2026 and no ruling had issued as of August 2026.

Source: Jersey Vindicator

Notes on the record

Hexa Builders received planning board approval on 8 January 2026 (memorialized 2 February 2026) for two warehouses of roughly 522,000 and 1.1 million sq ft at 3043 Black Horse Pike, with the larger building planned for eventual conversion to a data center. The data center use was never separately approved: Monroe Township adopted a township-wide ban on 22 April 2026 and the application was deemed incomplete in May 2026. No megawatt figure was ever published. Coordinates are a street-level geocode of Black Horse Pike in Williamstown; no parcel-level point is available.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Black Horse Pike Data Center (3043 Black Horse Pike)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Black Horse Pike Data Center (3043 Black Horse Pike) in Monroe Township?

Yes. Black Horse Pike Data Center (3043 Black Horse Pike) in Monroe Township, Gloucester County, New Jersey is or has been the subject of litigation over its siting, permitting, or operation. Hexa filed a 104-page, 20-count suit on 5 June 2026 seeking a declaration that the ban is unconstitutional, reversal of the planning board's rejection and $300 million in damages.

Has anyone filed a lawsuit over the Black Horse Pike Data Center (3043 Black Horse Pike)?

Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.

How much water does Black Horse Pike Data Center (3043 Black Horse Pike) use?

No water withdrawal figure for Black Horse Pike Data Center (3043 Black Horse Pike) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Black Horse Pike Data Center (3043 Black Horse Pike), and how big is it?

Hexa Builders is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Black Horse Pike Data Center (3043 Black Horse Pike)," updated September 14, 2026, https://suedatacenters.org/data-centers/hexa-builders-black-horse-pike-monroe-nj.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/hexa-builders-black-horse-pike-monroe-nj, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.'Developer challenges Gloucester County data center ban on free-speech grounds', Jersey Vindicator, 1 August 2026 · Jersey Vindicator · retrieved September 14, 2026
  2. 2.OpenStreetMap street-level geocode for Black Horse Pike, Williamstown, Monroe Township, Gloucester County NJ 08094, via Nominatim · OpenStreetMap contributors · retrieved September 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us