Data Center Registry
IREN Sweetwater Campus
Sweetwater, Nolan County, Texas · All 3 IREN sites
IREN Sweetwater Campus is a data center under construction in Sweetwater, Texas (Nolan County), operated by IREN (Iris Energy). The public record puts it at announced 2025, 2 GW planned, 2,200 acres. It has documented support and documented opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- IREN (Iris Energy)
- Facility type
- Data center, AI use confirmed
- Location
- Sweetwater, Nolan County, TX
- Coordinates
- 32.4707, -100.4059
- Power capacity
- 2 GW planned
- Land
- 2,200 acres
- Investment
- Not established from a public source
- Announced
- 2025
- Utility
- ERCOT
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 350 permanent; 700 construction
- Public subsidy
- Tax Increment Reinvestment Zone (TIRZ) No. 1, Nolan County, Nolan County, TX, 2025
- Community reception
- Mixed reception
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 2026Under constructionMay 1, 2026: Sweetwater 1 1,400 MW substation energized, connecting to ERCOT grid via 345kV high-voltage line. Data centers commissioning in phases; power to ramp with construction. Source: IREN investor relations
- March 2025ProposedMar 17, 2025: IREN announces 600 MW grid connection agreement for Sweetwater 2 in Fisher County, bringing total secured power to 2.75 GW across West Texas. Source: IREN investor relations
- January 2025ProposedJan 21, 2025 IREN business update: first formal public announcement of 1,400 MW Sweetwater data center development. October 2024 update had disclosed HPC/AI pivot on 1,300+ acres. Source: IREN investor relations
Opposition and litigation at this site
Partly. Both documented support and documented opposition to IREN Sweetwater Campus in Sweetwater, Nolan County, Texas appear in the record, with no clear majority position. No documented site-specific opposition to IREN Sweetwater found.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.
No documented site-specific opposition to IREN Sweetwater found. Nolan County TIRZ public hearing (June 2025) recorded zero opposition comments. Broader rural West Texas context: Texas Tribune (Oct 2025) reported growing community concern over data center water use; Texas PUC water survey (June 2026) found most operators non-responsive. TIRZ was approved by Nolan County to enable hyperscale data center development; specific operator in TIRZ article is Deriva Energy (ROW agreement), not confirmed as IREN.
Power and water
345kV high-voltage connection to ERCOT grid. IREN and third-party sources describe West Texas as one of the world's largest renewable energy markets; interconnection.fyi lists renewable energy via RECs (wind/solar) for this site.
Direct-to-chip liquid cooling plus supplemental air cooling. Closed-loop design described by IREN and analysts as dramatically reducing water consumption vs. traditional evaporative approaches. West Texas arid climate noted as a water-conservation design driver. No reported MGD figure confirmed.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Tax Increment Reinvestment Zone (TIRZ) No. 1, Nolan County | Not established | Nolan County, TX | 2025 |
Notes on the record
Two-site campus: Sweetwater 1 (1,400 MW, ~1,700 acres, Nolan/Jones County boundary area) substation energized May 1, 2026 via 345kV ERCOT connection; data centers commissioning in phases. Sweetwater 2 (600 MW, ~500 acres, Fisher County, near Hamlin TX, ~28 miles from SW1) targeted energization late 2027 per IREN (some sources cite 2028). Direct fiber loop planned between sites for single 2 GW compute hub with <10ms latency to Dallas. Coordinates are approximate (Sweetwater city center, Nolan County seat). County boundary sources conflicting: DCD says Fisher County for both sites; interconnection.fyi and dispatch brief cite Nolan County for SW1; northwiseproject.com says Nolan and Jones Counties span the campus. IREN's $9.7B Microsoft contract (Nov 2025) and $3.4B NVIDIA contract (May 2026) are company-wide deals currently deployed at Childress, TX campus (Horizon 1-4); the NVIDIA partnership press release specifically names Sweetwater as the flagship future deployment site for NVIDIA DSX factory architecture. No confirmed customer contracts specific to Sweetwater site as of 2026-07-07. IREN was in Sweetwater since 2022 as a Bitcoin mining site; HPC/AI pivot announced October 2024. Interconnection.fyi lists renewable energy sourcing via RECs (wind/solar) at this site.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Crusoe Nolan County Data Center · Sweetwater · Crusoe Energy Systemsunder 1 mile · Proposed · 200 MW
- Cipher Barber Lake Campus · Colorado City · Cipher Digital27 mi · Under construction · 300 MW
Questions people ask about this site
Is there opposition to the IREN Sweetwater Campus in Sweetwater?
Partly. Both documented support and documented opposition to IREN Sweetwater Campus in Sweetwater, Nolan County, Texas appear in the record, with no clear majority position. No documented site-specific opposition to IREN Sweetwater found.
Has anyone filed a lawsuit over the IREN Sweetwater Campus?
No lawsuit over IREN Sweetwater Campus appears in the record we track as of July 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does IREN Sweetwater Campus use?
No water withdrawal figure for IREN Sweetwater Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates IREN Sweetwater Campus, and how big is it?
IREN (Iris Energy) is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 2 GW. The site is recorded at 2200 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "IREN Sweetwater Campus," updated July 25, 2026, https://suedatacenters.org/data-centers/iren-sweetwater-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iren-sweetwater-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.IREN Announces Successful Energization of Sweetwater 1 · IREN investor relations · retrieved July 7, 2026
- 2.IREN Announces Successful Energization of Sweetwater 1 (May 1, 2026) · GlobeNewswire · retrieved July 7, 2026
- 3.IREN Business Update Jan 21, 2025, first 1,400 MW Sweetwater announcement · IREN investor relations · retrieved July 7, 2026
- 4.IREN Secures 2.75GW for Data Centers in West Texas, Sweetwater 2 600 MW announcement (Mar 17, 2025) · IREN investor relations · retrieved July 7, 2026
- 5.IREN Secures $9.7bn AI Cloud Contract with Microsoft (Nov 3, 2025) · IREN investor relations · retrieved July 7, 2026
- 6.Iren energizes first phase of 2GW Sweetwater data center campus in Texas · Data Center Dynamics · retrieved July 7, 2026
- 7.IREN Expands Data Center Power to 2.75GW with New Texas Agreement (Sweetwater 2) · StockTitan · retrieved July 7, 2026
- 8.NVIDIA Anchors IREN With $3.4B Contract And $2.1B Equity Warrant (May 2026) · Global Data Center Hub · retrieved July 7, 2026
- 9.Nolan County approves Tax Increment Reinvestment Zone No. 1 for hyperscale data center development (June 2025) · Sweetwater Reporter · retrieved July 7, 2026
- 10.Rural Texas casting skeptical eye on data center openings, water concerns (Oct 2025) · Texas Tribune · retrieved July 7, 2026
- 11.IREN Sweetwater 1, interconnection queue record · Interconnection.fyi · retrieved July 7, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us