Project Emerald (Kiowa)

Kiowa, Pittsburg County, Oklahoma · All 4 IREN sites

ProposedContestedRecord updated September 14, 2026

Project Emerald (Kiowa) is a proposed data center in Kiowa, Oklahoma (Pittsburg County), operated by IREN. The public record puts it at announced April 2026, 2,000 acres. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
IREN
Facility type
Data center
Location
Kiowa, Pittsburg County, OK
Coordinates
34.7207, -95.8992 (approximate)
Power capacity
Not established from a public source
Land
2,000 acres
Investment
Not established from a public source
Announced
April 2026
Utility
Public Service Company of Oklahoma (PSO)
Power source
Grid
Cooling
Not established
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Contested
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 21, 2026
    Proposed
    Pittsburg County Tax Incentive District review committee voted to advance an economic development plan tied to the project to the participating taxing entities. Source: KJRH

Opposition and litigation at this site

Yes. Project Emerald (Kiowa) in Kiowa, Pittsburg County, Oklahoma is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Residents raised concerns over electricity costs, water use, noise, property values, pre-existing oil leases and grid reliability; two public meetings were scheduled at Kiowa High School in May 2026.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.

Residents raised concerns over electricity costs, water use, noise, property values, pre-existing oil leases and grid reliability; two public meetings were scheduled at Kiowa High School in May 2026.

Source: McAlester News-Capital

Power and water

IREN representative Jason Date told KJRH the campus would draw power from PSO.

IREN says water would come from the City of Kiowa, with the possibility of hauling water in from outside the county or state if needed, and states it is "confident it would not use excess water quantities." Residents at the April 2026 hearings cited a ~5 million gallons/day operating figure as a concern; that figure is a community claim, not an operator-reported number.

Notes on the record

Proposed 2,000-acre campus along U.S. Highway 69 just south of Kiowa in Pittsburg County, with an alternative siting roughly 8 miles south in Atoka County also under consideration; both sides of Highway 69 are in play. Coordinates are the town of Kiowa, not a parcel-confirmed footprint. This is a DIFFERENT IREN site from the already-tracked IREN Woods County campus in northwest Oklahoma. Capacity and investment figures circulating in secondary coverage were not stated in the two sources read here, so they are deliberately omitted.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Free case review

Living near Project Emerald (Kiowa)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Project Emerald (Kiowa) data center in Kiowa?

Yes. Project Emerald (Kiowa) in Kiowa, Pittsburg County, Oklahoma is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Residents raised concerns over electricity costs, water use, noise, property values, pre-existing oil leases and grid reliability; two public meetings were scheduled at Kiowa High School in May 2026.

Has anyone filed a lawsuit over the Project Emerald (Kiowa) data center?

No lawsuit over Project Emerald (Kiowa) appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Project Emerald (Kiowa) use?

No water withdrawal figure for Project Emerald (Kiowa) is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Project Emerald (Kiowa), and how big is it?

IREN is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 2000 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Emerald (Kiowa)," updated September 14, 2026, https://suedatacenters.org/data-centers/iren-project-emerald-kiowa-ok.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iren-project-emerald-kiowa-ok, retrieved September 30, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.'Project Emerald': AI data center plan in Pittsburg County moving forward · KJRH · retrieved September 14, 2026
  2. 2.Proposed data center concerns residents · McAlester News-Capital · retrieved September 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us