Data Center Registry
Klondike Wyalusing Data Center
Wyalusing, Bradford County, Pennsylvania
Klondike Wyalusing Data Center is a permitted data center in Wyalusing, Pennsylvania (Bradford County), operated by KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy). The public record puts it at 335 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy)
- Facility type
- Data center
- Location
- US Route 6, Wyalusing, Bradford County, PA
- Coordinates
- 41.6966, -76.2440 (approximate)
- Power capacity
- Not established from a public source
- Land
- 335 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- On site gas
- On site generation
- 248 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 9, 2025PermittedPA DEP issued an air quality plan approval for the Wyalusing Energy Center, eight natural gas turbines totalling 248 MW nameplate, serving the hyperscale data center on the 335-acre Route 6 property; permit effective through 2027-04-08. Bradford County adopted data center SALDO standards on 2026-07-09. Source: NorthcentralPA.com
Opposition and litigation at this site
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Klondike Wyalusing Data Center in Wyalusing, Bradford County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
The permitted Wyalusing Energy Center comprises eight 31 MW natural gas combustion turbines (248 MW nameplate) plus a diesel emergency fire pump, of which up to 218 MW is designated for data center operations.
Notes on the record
The exact position of the data center within the 335-acre parcel has not been disclosed, so coordinates are the Wyalusing Township point. The site previously held a 2019 air approval for an LNG processing plant that was never built and has expired. Permitted annual limits reported for the energy center: ~74 tons NOx, 93 tons CO, 92 tons PM, and just over 1.1 million tons CO2e, recorded here in notes rather than as emissions fields because the cited source is press coverage rather than the permit document itself.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the Klondike Wyalusing Data Center in Wyalusing?
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Klondike Wyalusing Data Center in Wyalusing, Bradford County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Klondike Wyalusing Data Center?
No lawsuit over Klondike Wyalusing Data Center appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Klondike Wyalusing Data Center use?
No water withdrawal figure for Klondike Wyalusing Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Klondike Wyalusing Data Center, and how big is it?
KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy) is the operator on record. No capacity figure is on record for this site. The site is recorded at 335 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Klondike Wyalusing Data Center," updated September 25, 2026, https://suedatacenters.org/data-centers/klondike-wyalusing-data-center-bradford-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/klondike-wyalusing-data-center-bradford-pa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Bradford County adopts data center rules, Wyalusing hyperscale project's air permit issued · NorthcentralPA.com · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us