Sue Data Centers

Data Center Registry

MARA Flared/Stranded-Gas Mining Fleet (TX + ND)

Midland/Odessa area (representative), Texas · All 8 MARA Holdings sites · Every MARA Holdings case on our tracker

OperatingNo reception on recordRecord updated July 10, 2026

MARA Flared/Stranded-Gas Mining Fleet (TX + ND) is an operating crypto mining site in Midland/Odessa area (representative), Texas, operated by MARA Holdings. The public record puts it at 25 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
MARA Holdings
Facility type
Crypto mining
Location
Midland/Odessa area (representative), TX
Coordinates
31.8700, -102.3700 (representative_multi_site)
Power capacity
25 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
On-site flared/stranded natural gas at oil & gas wellheads (not grid-connected)
Power source
On site gas
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 2025
    Operating
    Program described as "fully energized" at 25 MW aggregate, now spanning wellhead sites in both Texas and North Dakota. Source: MARA Holdings (Investor Relations)
  2. 2024
    Proposed
    MARA launches a 25 MW flared/stranded-gas mining pilot in Texas. Source: MARA Holdings (Investor Relations)

Opposition and litigation at this site

Nothing on record as of July 10, 2026. No lawsuit, organized opposition, or contested hearing over MARA Flared/Stranded-Gas Mining Fleet (TX + ND) in Midland/Odessa area (representative), Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Captures gas that would otherwise be flared/vented at oil & gas wellheads and combusts it in generators to power mining hardware, framed by MARA as reducing methane venting (methane → CO2 combustion swap), not as a zero-emissions source.

Notes on the record

Represented here as a single aggregate record rather than N per-site entries: MARA discloses this program only in aggregate (25 MW total across Texas + North Dakota wellheads), with no per-site count, capacity breakdown, or coordinates published, consistent with a genuinely mobile/modular operating model (containerized generators moved between wellheads as flaring economics shift at individual wells), not merely underreported. Most recent confirmed figure is from MARA's June 2025 operational update; no 2026 update was found. This is the first record using the schema's location.precision: "representative_multi_site" construct, built for exactly this case, other operators running a similar distributed flared-gas-at-wellhead model include Upstream Data, Giga Energy, and EZ Blockchain (not separately catalogued here). No sourced critical/counter-framing on flared-gas mining (e.g. that it incentivizes continued drilling) was found in this research pass, flagged as a gap, not an absence of the argument in wider discourse.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the MARA Flared/Stranded-Gas Mining Fleet (TX + ND) data center in Midland/Odessa area (representative)?

Nothing on record as of July 10, 2026. No lawsuit, organized opposition, or contested hearing over MARA Flared/Stranded-Gas Mining Fleet (TX + ND) in Midland/Odessa area (representative), Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the MARA Flared/Stranded-Gas Mining Fleet (TX + ND) data center?

No lawsuit over MARA Flared/Stranded-Gas Mining Fleet (TX + ND) appears in the record we track as of July 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does MARA Flared/Stranded-Gas Mining Fleet (TX + ND) use?

No water withdrawal figure for MARA Flared/Stranded-Gas Mining Fleet (TX + ND) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates MARA Flared/Stranded-Gas Mining Fleet (TX + ND), and how big is it?

MARA Holdings is the operator on record. We hold 8 sites for that company across the registry. Capacity on record is 25 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "MARA Flared/Stranded-Gas Mining Fleet (TX + ND)," updated July 10, 2026, https://suedatacenters.org/data-centers/mara-flared-gas-fleet-tx-nd.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/mara-flared-gas-fleet-tx-nd, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.MARA Announces Bitcoin Production and Mining Operation Updates for April 2025 · MARA Holdings (Investor Relations) · retrieved July 10, 2026
  2. 2.Bitcoin Mining Using Stranded Natural Gas Is the Most Cost-Effective Way to Reduce Emissions · K33 Research · retrieved July 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us