South Annville Township Data Center Campus (withdrawn) is a cancelled data center in South Annville Township, Pennsylvania (Lebanon County), operated by Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner). The public record puts it at 99 acres, a reported $1.7 billion investment. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner)
Facility type
Data center
Location
South Annville Township, Lebanon County, PA
Coordinates
40.2907, -76.5193 (approximate)
Power capacity
Not established from a public source
Land
99 acres
Investment
$1.7 billion
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. May 13, 2026
    Cancelled
    Counsel for the petitioner wrote to the Board of Supervisors that it had 'decided to no longer pursue the development of a data center in South Annville Township.' Source: LebTown

Opposition and litigation at this site

Yes. Organized local opposition to South Annville Township Data Center Campus (withdrawn) in South Annville Township, Lebanon County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. A community organizer gathered more than 500 petition signatures, described as roughly one third of the township's adult population.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

A community organizer gathered more than 500 petition signatures, described as roughly one third of the township's adult population. The planning commission voted unanimously on May 5, 2026 against recommending the rezoning.

Source: LebTown

Notes on the record

A $1.7 billion proposal for five buildings of about 150,000 sq ft each across roughly 99 acres on four parcels near Mount Pleasant Road and U.S. Route 422, west of Annville Borough, by York-based Inch & Co. in a joint venture with Eastern Land & Resources Co. The application sought rezoning of about 58 acres to I-1 industrial. Withdrawn May 13, 2026. Coordinate is a township-centroid geocode.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the South Annville Township Data Center Campus (withdrawn) in South Annville Township?

Yes. Organized local opposition to South Annville Township Data Center Campus (withdrawn) in South Annville Township, Lebanon County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. A community organizer gathered more than 500 petition signatures, described as roughly one third of the township's adult population.

Has anyone filed a lawsuit over the South Annville Township Data Center Campus (withdrawn)?

No lawsuit over South Annville Township Data Center Campus (withdrawn) appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does South Annville Township Data Center Campus (withdrawn) use?

No water withdrawal figure for South Annville Township Data Center Campus (withdrawn) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates South Annville Township Data Center Campus (withdrawn), and how big is it?

Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner) is the operator on record. No capacity figure is on record for this site. The site is recorded at 99 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "South Annville Township Data Center Campus (withdrawn)," updated September 12, 2026, https://suedatacenters.org/data-centers/inch-eastern-land-south-annville-lebanon-pa.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/inch-eastern-land-south-annville-lebanon-pa, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.South Annville Twp. data center project scrapped after grass-roots opposition · LebTown · retrieved September 12, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us