Data Center Registry
365 Data Centers Bridgewater
Bridgewater, Somerset County, New Jersey · All 6 365 Data Centers sites
365 Data Centers Bridgewater is an operating data center in Bridgewater, New Jersey (Somerset County), operated by 365 Data Centers. The public record puts it at 2.3 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- 365 Data Centers
- Facility type
- Data center
- Location
- 999 Frontier Road, Bridgewater, Somerset County, NJ, 08807
- Coordinates
- 40.5814, -74.5739
- Power capacity
- 2.3 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026OperatingPublished as an operating colocation facility on 365 Data Centers' own New Jersey page. Source: 365 Data Centers
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Bridgewater in Bridgewater, Somerset County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
365 lists a 300-ton N+1 cooling plant with four new 60-ton dry coolers and three split condenser units, a recirculating circuit rejecting heat to air, with no evaporative tower published.
Notes on the record
25,600 sq ft data center with 2.3 MW of power and 20 MW total available for future expansion; N+1 UPS above 2 MW, a 2N generator with a 13,000-gallon fuel tank rated for 72 hours, and nearly 300 cabinets, cages and suites.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Digital Realty Somerset (650 Randolph Road) · Franklin Township (Somerset) · Digital Realty3 mi · Operating
- CyrusOne NYM1 (Somerset) · Somerset · CyrusOne3 mi · Operating · 30 MW
- Digital Fortress PNJ (Piscataway) · Piscataway · Digital Fortress5 mi · Operating · 1.8 MW
- QTS Piscataway 1 · Piscataway · QTS Data Centers5 mi · Operating · 65 MW
- Digital Realty New York EWR12 · Piscataway Township · Digital Realty6 mi · Operating
- Centersquare EWR3 (Piscataway) · Piscataway · Centersquare6 mi · Operating · 54.8 MW
- Digital Realty New York EWR11 · Piscataway Township · Digital Realty6 mi · Operating
- DataBank EWR2 (Piscataway) · Piscataway · DataBank6 mi · Operating · 3 MW
Questions people ask about this site
Is there opposition to the 365 Data Centers Bridgewater data center in Bridgewater?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Bridgewater in Bridgewater, Somerset County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the 365 Data Centers Bridgewater data center?
No lawsuit over 365 Data Centers Bridgewater appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does 365 Data Centers Bridgewater use?
No water withdrawal figure for 365 Data Centers Bridgewater is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates 365 Data Centers Bridgewater, and how big is it?
365 Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 2.3 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "365 Data Centers Bridgewater," updated September 14, 2026, https://suedatacenters.org/data-centers/365-data-centers-bridgewater-nj.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/365-data-centers-bridgewater-nj, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.365 Data Centers Bridgewater, New Jersey data center page · 365 Data Centers · retrieved September 14, 2026
- 2.OpenStreetMap mapped building '365 Bridgewater NJ', 999 Frontier Road, Bridgewater Township NJ 08807, via Nominatim · OpenStreetMap contributors · retrieved September 14, 2026
- 3.PeeringDB facility records 6085 / 10349, '365 Data Centers Bridgewater (BW1)' / '(NJ1)', 999 Frontier Road, Bridgewater NJ 08807 · PeeringDB · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us