Data Center Registry
MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)
Conshohocken, Montgomery County, Pennsylvania · All 2 MLP Ventures sites
MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) is a proposed data center in Conshohocken, Pennsylvania (Montgomery County), operated by MLP Ventures. The public record puts it at announced 2025, 66 acres, a reported $9 billion investment. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- MLP Ventures
- Facility type
- Data center
- Location
- 900 Conshohocken Road, Conshohocken, Montgomery County, PA
- Coordinates
- 40.0860, -75.3120 (approximate)
- Power capacity
- Not established from a public source
- Land
- 66 acres
- Investment
- $9 billion
- Announced
- 2025
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 110 permanent
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- June 2026ProposedZoning application (special exception) before the Plymouth Township Zoning Board. Source: Metro Philadelphia
Opposition and litigation at this site
Yes. Organized local opposition to MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) in Conshohocken, Montgomery County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. Application drew heavy opposition from residents and business owners at the Plymouth Township Zoning Board hearing (June 2026).
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
Application drew heavy opposition from residents and business owners at the Plymouth Township Zoning Board hearing (June 2026).
Notes on the record
Proposed ~2 million sq ft hyperscale data center converting the former Cleveland-Cliffs/Alan Wood steel mill at 900 Conshohocken Road in the Connaughtown section of Plymouth Township, Montgomery County. Roughly 66-acre heavy-industrial parcel; developer Brian O'Neill (MLP Ventures) cites ~$9B investment and ~110 permanent jobs (~55 per shift). Coordinates are an approximate geocode of the cited street address.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Renaissance Park and Innovation Data Center Campus · King of Prussia · MLP Ventures2 mi · Proposed · Opposed
- Lumen Norristown · Norristown · Lumen Technologies6 mi · Operating
- TierPoint Valley Forge · Norristown · TierPoint6 mi · Operating
- Flexential Philadelphia - Collegeville (PHL01) · Collegeville · Flexential10 mi · Operating · 7.2 MW
- Sentinel East Whiteland Data Center · East Whiteland Township · Sentinel Data Centers13 mi · Under construction · 300 MW · In litigation
- Pennhurst Data Center Campus · Spring City · Penn Hurst Holdings15 mi · Proposed · In litigation
- Limerick Township Data Center Campus (MCD 7) · Limerick Township · MCD 7 LLC18 mi · Proposed · 750 MW · Opposed
- Metrobloks PHL-MB01 (285 Swedesboro Road) · Gibbstown · Metrobloks19 mi · Proposed
Questions people ask about this site
Is there opposition to the MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) in Conshohocken?
Yes. Organized local opposition to MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) in Conshohocken, Montgomery County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. Application drew heavy opposition from residents and business owners at the Plymouth Township Zoning Board hearing (June 2026).
Has anyone filed a lawsuit over the MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)?
No lawsuit over MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) use?
No water withdrawal figure for MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant), and how big is it?
MLP Ventures is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 66 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)," updated September 25, 2026, https://suedatacenters.org/data-centers/mlp-ventures-plymouth-township-conshohocken-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/mlp-ventures-plymouth-township-conshohocken-pa, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Battle begins over proposed data center in Plymouth Township · Metro Philadelphia · retrieved August 2, 2026
- 2.Developer proposes another hyperscale data center in MontCo · The Chestnut Hill Local · retrieved September 21, 2026
- 3.Proposed data center in Plymouth Township faces roadblocks · North Penn Now · retrieved August 2, 2026 · original offline, no archived copy found
- 4.Conshohocken area data center plans resubmitted in Plymouth Township · Suburban Realtors Alliance · retrieved September 25, 2026
- 5.Plymouth Township data center fight continues · NBC10 Philadelphia · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us