Data Center Registry
Washington Township Technical Campus
Washington, Macomb County, Michigan · All 9 Prologis sites
Washington Township Technical Campus is a cancelled data center in Washington, Michigan (Macomb County), operated by Prologis. The public record puts it at 312 acres. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Cancelled
- Operator
- Prologis
- Facility type
- Data center
- Location
- South side of 32 Mile Road between M-53 and Powell Road, Washington, Macomb County, MI
- Coordinates
- 42.8033, -82.9800 (approximate)
- Power capacity
- Not established from a public source
- Land
- 312 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 2026CancelledPrologis withdrew the rezoning application on 2026-05-19, stating it would wait until the township adopts a data-center ordinance before proceeding. Source: Planet Detroit
- November 2025ProposedPrologis submitted a conditional rezoning application for a technical campus and data center on 312 acres across four parcels, seeking an Industrial-Research-Technology district with a five-year reversion clause. Source: Planet Detroit
Opposition and litigation at this site
Yes. Organized local opposition to Washington Township Technical Campus in Washington, Macomb County, Michigan is documented in the public record, without a lawsuit on file in the sources we track. The proposal drew months of discussion and protests from Washington Township and neighbouring residents.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
The proposal drew months of discussion and protests from Washington Township and neighbouring residents. After the withdrawal the township clerk proposed a temporary moratorium on all data-center applications, added to the 2026-05-20 board agenda, saying it 'will give our community time to put legal safeguards in place.'
Notes on the record
312 acres on the south side of 32 Mile Road between M-53 and Powell Road, spanning four parcels near Romeo State Airport and the former Romeo Ford plant. Status 'cancelled' reflects the withdrawn application; the company's attorney stated an intent to return after the township revises its zoning ordinance, so this is a pause rather than confirmed abandonment. Note the rezoning alone would NOT have permitted a data center, the source states a further 'special land use' approval would have been required. CONFIRMED ABSENCES: no megawatt capacity, investment figure, building count, water figure or job count is stated in either source. Coordinates are the US Census geocoder's match for the 32 Mile Rd / Powell Rd intersection named in the source; the four-parcel boundary is not confirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Oakland University Campus Computing Facility · Auburn Hills · Fairmount Properties (with Oakland University)15 mi · Proposed · 26 MW · Mixed reception
- 123NET Southfield DC1 · Southfield · 123NET26 mi · Operating · 4 MW
- 123NET Southfield DC2 (Southfield Data Center NW) · Southfield · 123NET27 mi · Operating
- 123NET Southfield DC3 (Southfield Data Center W) · Southfield · 123NET27 mi · Operating
- 365 Data Centers Detroit (DT1) · Southfield · 365 Data Centers27 mi · Operating
- Metrobloks Southfield Data Center · Southfield · Metrobloks28 mi · Permitted · 100 MW · Contested
- EdgeConneX DET01 · Detroit (Oakland County) · EdgeConneX28 mi · Operating
Questions people ask about this site
Is there opposition to the Washington Township Technical Campus in Washington?
Yes. Organized local opposition to Washington Township Technical Campus in Washington, Macomb County, Michigan is documented in the public record, without a lawsuit on file in the sources we track. The proposal drew months of discussion and protests from Washington Township and neighbouring residents.
Has anyone filed a lawsuit over the Washington Township Technical Campus?
No lawsuit over Washington Township Technical Campus appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Washington Township Technical Campus use?
No water withdrawal figure for Washington Township Technical Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Washington Township Technical Campus, and how big is it?
Prologis is the operator on record. We hold 9 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 312 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Washington Township Technical Campus," updated September 9, 2026, https://suedatacenters.org/data-centers/prologis-washington-township-mi.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prologis-washington-township-mi, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Washington Township data center developer withdraws application · Planet Detroit · retrieved September 9, 2026
- 2.How many AI data centers are planned in Michigan? We counted. · Gander Newsroom · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us