H5 Data Centers Buffalo II
Lockport, Niagara County, New York · All 17 H5 Data Centers sites
H5 Data Centers Buffalo II is an operating data center in Lockport, New York (Niagara County), operated by H5 Data Centers. The public record puts it at a reported $170 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- H5 Data Centers
- Facility type
- Data center
- Location
- 5369 Crown Drive, Lockport, Niagara County, NY, 14094
- Coordinates
- 43.1697, -78.7481 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- $170 million
- Announced
- Not established from a public source
- Utility
- National Grid
- Power source
- Hydro
- Cooling
- Hybrid
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Buffalo II in Lockport, Niagara County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Second Lockport building, brought online in 2015. Data Center Knowledge (2015) describes the expansion as having "7.2 megawatts of hydropower", alongside the original 15-megawatt data center; as of October 2026 the article does not name NYPA or say the 7.2 MW is an allocation.
Same Yahoo Computing Coop design as the first building: chillerless, outside-air cooling with an evaporative-cooling system for hot weather.
Notes on the record
5365 Crown Dr, Lockport, NY, confirmed as a genuinely separate building (~0.25 mi from H5 Buffalo I / 5319 Enterprise Dr, not a duplicate listing), part of the same Lockport campus. Built 2015 as part of a $170M expansion announced 2013 (the campus's second facility). Acquired by H5 alongside Buffalo I in the same Dec 2024 Yahoo sale-leaseback deal. Specific square footage and power capacity for this building alone are paywalled on data-center directories and not independently confirmed, deliberately omitted rather than estimated from the shared 409,200 sq ft campus total (which spans both buildings). Coordinates are a nearby-offset approximation of the campus location, not an independently confirmed parcel pin for this specific building. The county parcel lookup behind this record used street number 5365, while PeeringDB and the street recorded here give 5369 Crown Drive; both are on the same campus road.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- H5 Data Centers Buffalo I (formerly Yahoo Lockport) · Lockport · H5 Data Centersunder 1 mile · Operating
- BlackRock Data Center, Amherst (CrossPoint Business Park) · Amherst · BlackRock, Inc.9 mi · Operating
- Digihost / Digi Power X, Fortistar North Tonawanda · North Tonawanda · Digihost (Digi Power X)10 mi · Operating · 120 MW · In litigation
- Riverview Innovation & Technology Campus · Tonawanda · Riverview Innovation & Technology Campus12 mi · Proposed · 300 MW · Contested
- TeraWulf Lake Mariner · Barker · TeraWulf14 mi · Operating · 750 MW
- Blockfusion Niagara Falls Facility (North East Data) · Niagara Falls · Blockfusion15 mi · Operating · 100 MW · Contested
- 9LDG Niagara AI Data Center · Niagara Falls · 9 Lives Digital Group (9LDG)15 mi · Proposed · Supported
- American Bitcoin, Niagara Falls ("Alpha Site") · Niagara Falls · American Bitcoin (Hut 8)15 mi · Operating · 50 MW · In litigation
Questions people ask about this site
Is there opposition to the H5 Data Centers Buffalo II data center in Lockport?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Buffalo II in Lockport, Niagara County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the H5 Data Centers Buffalo II data center?
No lawsuit over H5 Data Centers Buffalo II appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does H5 Data Centers Buffalo II use?
No water withdrawal figure for H5 Data Centers Buffalo II is on record here. Cooling is recorded as hybrid, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates H5 Data Centers Buffalo II, and how big is it?
H5 Data Centers is the operator on record. We hold 17 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "H5 Data Centers Buffalo II," updated October 28, 2026, https://suedatacenters.org/data-centers/h5-buffalo-ii-lockport-ny.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/h5-buffalo-ii-lockport-ny, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.H5 Buffalo II · Baxtel · retrieved July 10, 2026
- 2.H5 Acquires New York Data Centers From Yahoo in Sale-Leaseback Deal · Data Center Dynamics · retrieved July 10, 2026
- 3.Niagara County parcel/GIS record (parcel 108.00-1-34.211/A (SBL 1080000001034211 A)) · Niagara County GIS / Assessor · retrieved July 18, 2026
- 4.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
- 5.Yahoo Launches Second 'Computing Coop' Data Center in New York State · Data Center Knowledge · retrieved September 9, 2026
- 6.PeeringDB: H5 Data Centers Buffalo II, 5369 Crown Dr, Lockport NY 14094 (H5 Buffalo Campus) · PeeringDB · retrieved October 9, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us