Data Center Registry
ValorC3 Boise Data Center (former Fiberpipe)
Boise, Ada County, Idaho · All 3 ValorC3 Data Centers sites
ValorC3 Boise Data Center (former Fiberpipe) is an operating data center in Boise, Idaho (Ada County), operated by ValorC3 Data Centers. The public record puts it at 2 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- ValorC3 Data Centers
- Facility type
- Data center
- Location
- 10215 W Emerald St, Boise, Ada County, ID, 83704
- Coordinates
- 43.6080, -116.3102 (approximate)
- Power capacity
- 2 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of October 4, 2026. No lawsuit, organized opposition, or contested hearing over ValorC3 Boise Data Center (former Fiberpipe) in Boise, Ada County, Idaho appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Carrier-neutral colocation facility of about 45,600 sq ft and 2 MW (per CommercialSearch), built around 2000 by Fiberpipe. Tonaquint bought Fiberpipe in 2020 and later rebranded as ValorC3 Data Centers, which is owned by CVC DIF. PeeringDB still lists the site under the Tonaquint name. The pin is PeeringDB's coordinate for the address. This is a different site from ValorC3's greenfield Boise 2 build at 9601 W Emerald St (valorc3-boise-2-id). the AI use classification omitted: general enterprise colocation.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Centeris Boise (former HP / DataSite data center) · Boise · Centeris (The Benaroya Company)under 1 mile · Operating
- ValorC3 Boise 2 · Boise · ValorC3 Data Centersunder 1 mile · Under construction · 10 MW
- Ark Data Centers Boise (fka Involta) · Boise · Ark Data Centers (formerly Involta)2 mi · Operating
- Syringa Networks Boise · Boise · Syringa Networks6 mi · Operating
- Meta Kuna Data Center · Kuna · Meta10 mi · Operating · Supported
- Gemstone Technology Park · Kuna · Diode Ventures12 mi · Proposed · Contested
- Rhea Data Blacks Creek Campus · Rhea Data (subsidiary of Arevia Power)13 mi · Proposed · 600 MW · Contested
- T5 Nampa · Nampa · T5 Data Centers14 mi · Permitted · 8.25 MW
Questions people ask about this site
Is there opposition to the ValorC3 Boise Data Center (former Fiberpipe) in Boise?
Nothing on record as of October 4, 2026. No lawsuit, organized opposition, or contested hearing over ValorC3 Boise Data Center (former Fiberpipe) in Boise, Ada County, Idaho appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the ValorC3 Boise Data Center (former Fiberpipe)?
No lawsuit over ValorC3 Boise Data Center (former Fiberpipe) appears in the record we track as of October 4, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does ValorC3 Boise Data Center (former Fiberpipe) use?
No water withdrawal figure for ValorC3 Boise Data Center (former Fiberpipe) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates ValorC3 Boise Data Center (former Fiberpipe), and how big is it?
ValorC3 Data Centers is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 2 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "ValorC3 Boise Data Center (former Fiberpipe)," updated October 4, 2026, https://suedatacenters.org/data-centers/valorc3-boise-emerald-id.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/valorc3-boise-emerald-id, retrieved October 6, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.ValorC3 lands financing for 10MW Boise data center · Baxtel · retrieved October 4, 2026
- 2.ValorC3 Data Centers Eyes Idaho Expansion · CommercialSearch · retrieved October 4, 2026
- 3.ValorC3 plans second Boise data center for 2027 · Idaho Business Review · retrieved October 4, 2026
- 4.PeeringDB facility 9846: Tonaquint Data Center - Boise ID · PeeringDB · retrieved October 4, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us