Switch Atlanta: The KEEP is an operating data center in Lithia Springs, Georgia (Douglas County), operated by Switch.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Switch
Facility type
Data center, AI use likely
Location
Lithia Springs, Douglas County, GA
Coordinates
33.7550, -84.5873
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Georgia Power
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Switch Atlanta: The KEEP in Lithia Springs, Douglas County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Switch markets The KEEP as running on '100% green energy,' echoing its fleet-wide pledge, but no Georgia-specific solar/wind PPA or on-site generation project tied to Switch was found (Georgia Power's general CARES CIR customer-solar program is not confirmed as a Switch-specific deal).

Notes on the record

Confirmed at 1 Switch Way, Lithia Springs GA (Douglas County) via datacentermap, datacenters.com, baxtel. AI/HPC (likely): The Keep: Tier 5 Platinum exascale campus, high-density AI/HPC-capable.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Our reporting on this site

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Switch Atlanta: The KEEP data center in Lithia Springs?

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Switch Atlanta: The KEEP in Lithia Springs, Douglas County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Switch Atlanta: The KEEP data center?

No lawsuit over Switch Atlanta: The KEEP appears in the record we track as of July 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Switch Atlanta: The KEEP use?

No water withdrawal figure for Switch Atlanta: The KEEP is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Switch Atlanta: The KEEP, and how big is it?

Switch is the operator on record. We hold 18 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Switch Atlanta: The KEEP," updated July 24, 2026, https://suedatacenters.org/data-centers/switch-atlanta-the-keep-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/switch-atlanta-the-keep-ga, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Switch facility directory · Switch · retrieved July 22, 2026
  2. 2.OpenStreetMap way/975064004 · OpenStreetMap · retrieved July 22, 2026
  3. 3.Switch sustainable data center design page (Nevada-specific renewable claim, no GA project named) · retrieved July 24, 2026
  4. 4.Canary Media: Georgia Power will now let data centers bring their own clean energy (general utility program context, not Switch-specific) · retrieved July 24, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.