Sue Data Centers

Data Center Registry

Flexential Atlanta - Douglasville 1

Douglasville, Douglas County, Georgia · All 46 Flexential sites

OperatingNo reception on recordAI confirmedRecord updated September 21, 2026

Flexential Atlanta - Douglasville 1 is an operating data center in Douglasville, Georgia (Douglas County), operated by Flexential. The public record puts it at 22.5 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Flexential
Facility type
Data center, AI use confirmed
Location
Douglasville, Douglas County, GA
Coordinates
33.7311, -84.6161
Power capacity
22.5 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Georgia Power
Power source
Grid
Cooling
air
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Atlanta - Douglasville 1 in Douglasville, Douglas County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Metro colocation facility (22.5 MW total power, operational 2023) in the Georgia Power service area. No source found naming a specific utility partnership, on-site generation program, or renewable arrangement, standard grid service with backup diesel is the default assumption for this facility class.

Notes on the record

1700 N River Rd, 205,000 sqft, 22.5MW, Gen 5 design. AI/HPC (confirmed): DigitalOcean GPU Droplets on NVIDIA H200 + AMD Instinct, two data halls.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Flexential Atlanta - Douglasville 1?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Flexential Atlanta - Douglasville 1 data center in Douglasville?

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Atlanta - Douglasville 1 in Douglasville, Douglas County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Flexential Atlanta - Douglasville 1 data center?

No lawsuit over Flexential Atlanta - Douglasville 1 appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Flexential Atlanta - Douglasville 1 use?

No water withdrawal figure for Flexential Atlanta - Douglasville 1 is on record here. Cooling is recorded as air, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Flexential Atlanta - Douglasville 1, and how big is it?

Flexential is the operator on record. We hold 46 sites for that company across the registry. Capacity on record is 22.5 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Flexential Atlanta - Douglasville 1," updated September 21, 2026, https://suedatacenters.org/data-centers/flexential-atlanta-douglasville-1-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/flexential-atlanta-douglasville-1-ga, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Flexential facility directory · Flexential · retrieved July 22, 2026
  2. 2.OpenStreetMap way/1097502168 · OpenStreetMap · retrieved July 22, 2026
  3. 3.Flexential AI/HPC, DigitalOcean GPU Droplets on NVIDIA H200 + AMD Instinct, two data hall · datacenterdynamics.com · retrieved July 23, 2026
  4. 4.Flexential Douglasville 1, datacentermap.com · retrieved September 21, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us