Data Center Registry
Microsoft East Point Data Center (Ben Hill Road)
East Point, Fulton County, Georgia · All 56 Microsoft sites · Every Microsoft case on our tracker
Microsoft East Point Data Center (Ben Hill Road) is an operating data center in East Point, Georgia (Fulton County), operated by Microsoft. The public record puts it at 125 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Microsoft
- Facility type
- Data center
- Location
- Ben Hill Road, East Point, Fulton County, GA, 30349
- Coordinates
- 33.6466, -84.5174 (approximate)
- Power capacity
- Not established from a public source
- Land
- 125 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Hybrid
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2025OperatingFirst phase, one data center building, a power substation, privacy screening, support facilities and landscaping. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of September 23, 2026. No lawsuit, organized opposition, or contested hearing over Microsoft East Point Data Center (Ben Hill Road) in East Point, Fulton County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Microsoft states its South Fulton County datacenters use direct evaporative cooling that consumes zero water for cooling below 29.4 °C, limiting water use for cooling to under 15% of the year, a seasonal wet/dry design.
Notes on the record
125-acre campus on Ben Hill Road, part of Microsoft's East US 3 region alongside Palmetto (Fulton) and Douglasville (Douglas). Coordinates are the OSM geocode for Ben Hill Road in the 30349 ZIP, a road midpoint, not a parcel; the road spans a distance, so treat the pin as indicative. Microsoft confirmed in August 2026 that it is working with Fulton and Douglas counties to unwind local tax-incentive agreements covering East Point, Palmetto and Douglasville; the incentive detail is not recorded here because no per-site figure was confirmed on a fetched page.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Vantage Data Centers Westlake · South Fulton · Vantage Data Centers3 mi · Proposed
- CleanSpark College Park Bitcoin Mining Facility · College Park · CleanSpark, Inc.4 mi · Operating
- Union City Data Center Campus (EdgeConneX / TA Realty) · Union City · EdgeConneX (campus investment and operations with TA Realty; land owned by Microsoft, site development by Burr Computer Environments)4 mi · Under construction · 324 MW
- Digital Realty ATL11 · Austell · Digital Realty8 mi · Operating
- Flexential Atlanta - Douglasville 2 · Douglasville · Flexential8 mi · Operating
- Flexential Atlanta - Douglasville 1 · Douglasville · Flexential8 mi · Operating · 22.5 MW
- Switch Atlanta: The KEEP · Lithia Springs · Switch9 mi · Operating
- Digital Realty Fort Gillem Data Center Campus · Forest Park · Digital Realty9 mi · Proposed · 212 MW
Questions people ask about this site
Is there opposition to the Microsoft East Point Data Center (Ben Hill Road) in East Point?
Nothing on record as of September 23, 2026. No lawsuit, organized opposition, or contested hearing over Microsoft East Point Data Center (Ben Hill Road) in East Point, Fulton County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Microsoft East Point Data Center (Ben Hill Road)?
No lawsuit over Microsoft East Point Data Center (Ben Hill Road) appears in the record we track as of September 23, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Microsoft East Point Data Center (Ben Hill Road) use?
No water withdrawal figure for Microsoft East Point Data Center (Ben Hill Road) is on record here. Cooling is recorded as hybrid, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Microsoft East Point Data Center (Ben Hill Road), and how big is it?
Microsoft is the operator on record. We hold 56 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 125 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Microsoft East Point Data Center (Ben Hill Road)," updated September 23, 2026, https://suedatacenters.org/data-centers/microsoft-east-point-ben-hill-road-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/microsoft-east-point-ben-hill-road-ga, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Microsoft East Point Data Center · Baxtel · retrieved September 23, 2026
- 2.Understanding Microsoft datacenters in South Fulton County · Microsoft Local · retrieved September 23, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us