Skybox PowerCampus Austin (Hutto)
Hutto, Williamson County, Texas · All 5 Skybox Datacenters sites
Skybox PowerCampus Austin (Hutto) is a data center under construction in Hutto, Texas (Williamson County), operated by Skybox Datacenters (with Prologis). The public record puts it at announced May 5, 2023, 600 MW planned, 150 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Skybox Datacenters (with Prologis)
- Facility type
- Data center
- Location
- Hutto, Williamson County, TX
- Coordinates
- 30.5428, -97.5469 (approximate)
- Power capacity
- 600 MW planned
- Land
- 150 acres
- Investment
- Not established from a public source
- Announced
- May 5, 2023
- Utility
- Not established from a public source
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 22, 2026Under constructionA secondary tracker lists 2 buildings live of 600 MW at build-out. Status sources conflict, so this is recorded conservatively as under construction. Source: Inside the Datacenter
- May 5, 2023ProposedHutto City Council approved the development agreement for a 600 MW, 6-8 building campus. Source: Data Center Frontier
Opposition and litigation at this site
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Skybox PowerCampus Austin (Hutto) in Hutto, Williamson County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Adjacent to a 345 kV transmission corridor, with two private 300 MW dedicated substations.
Notes on the record
Acreage reported variously as 150 (Prologis VP, used here), 160, 220 and 224 acres. Datacentermap lists DC1 (72 MW) as under construction, while Baxtel and Inside the Datacenter list buildings as live. Coordinates are the Hutto city point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Blueprint Data Centers Taylor · Taylor · Blueprint Data Centers8 mi · Proposed · 60 MW
- Iron Mountain Williamson County Data Center Campus · Iron Mountain8 mi · Proposed
- Sabey SDC Austin (Round Rock) · Round Rock · Sabey Data Centers8 mi · Operating · 84 MW
- Switch: The Rock (Round Rock) · Round Rock · Switch8 mi · Under construction · 185 MW
- Blueprint Data Centers Georgetown · Georgetown · Blueprint Data Centers10 mi · Proposed · 25 MW
- Element Critical Austin One · Austin · Element Critical16 mi · Operating · 5 MW
- Cosmos Technology Campus (former 3M campus) · Austin · SB Energy20 mi · Under construction · 50 MW
- Lumen Austin 3 · Austin · Lumen Technologies22 mi · Operating
Questions people ask about this site
Is there opposition to the Skybox PowerCampus Austin (Hutto) data center in Hutto?
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Skybox PowerCampus Austin (Hutto) in Hutto, Williamson County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Skybox PowerCampus Austin (Hutto) data center?
No lawsuit over Skybox PowerCampus Austin (Hutto) appears in the record we track as of October 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Skybox PowerCampus Austin (Hutto) use?
No water withdrawal figure for Skybox PowerCampus Austin (Hutto) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Skybox PowerCampus Austin (Hutto), and how big is it?
Skybox Datacenters (with Prologis) is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 600 MW. The site is recorded at 150 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Skybox PowerCampus Austin (Hutto)," updated October 14, 2026, https://suedatacenters.org/data-centers/skybox-prologis-hutto-powercampus-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/skybox-prologis-hutto-powercampus-tx, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Skybox, Prologis Plan Massive 600-Megawatt Data Center Campus in Austin · Data Center Frontier · retrieved October 14, 2026
- 2.Every Data Center in Texas: Operating, Under Construction, and Proposed · Inside the Datacenter · retrieved October 14, 2026
- 3.OpenStreetMap Nominatim geocode: Hutto, TX · OpenStreetMap contributors · retrieved October 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us