Data Center Registry
Otava Ann Arbor Data Center
Ann Arbor, Washtenaw County, Michigan · All 3 Otava sites
Otava Ann Arbor Data Center is an operating data center in Ann Arbor, Michigan (Washtenaw County), operated by Otava.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Otava
- Facility type
- Data center
- Location
- Ann Arbor, Washtenaw County, MI
- Coordinates
- 42.2814, -83.7485 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Otava Ann Arbor Data Center in Ann Arbor, Washtenaw County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
DELIBERATE GAP: the operator page places this facility in the Avis Farms business park south of downtown but does not print a street address, and the commonly-cited 640 Avis Dr address appeared only in a search-results summary this session, never on a page that was fetched, so no street is asserted and the pin is a city-level geocode, not the building. A maintainer adding the address should confirm it against an operator-published page first. Generator/UPS figures are in kVA as published; no MW is derived from them.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Stargate The Barn Campus · Saline Township · OpenAI / Oracle / Related Digital8 mi · Under construction · 1.4 GW · In litigation
- Thor Equities Augusta Township Data Center (Form8tion) · Augusta Township · Thor Equities8 mi · Cancelled · Opposed
- York Township Data Center (Platt Road / former Toyota land) · York Township · Sansone Group11 mi · Cancelled
- U-M / Los Alamos Research Computing Center · Ypsilanti · University of Michigan (with Los Alamos National Laboratory)11 mi · Proposed · Opposed
- Project Cannoli · Van Buren Township · Google16 mi · Proposed · 1 GW · Contested
- Project Flex · Lyon Township · Verrus (Sidewalk Infrastructure Partners)17 mi · Proposed · Contested
- Otava Metro Detroit Data Center · Westland · Otava17 mi · Operating · 1.2 MW
- Wixom Road Data Center Campus · Wixom · Wixom Industrial One / Sansone Group20 mi · Proposed · Opposed
Questions people ask about this site
Is there opposition to the Otava Ann Arbor Data Center in Ann Arbor?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Otava Ann Arbor Data Center in Ann Arbor, Washtenaw County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Otava Ann Arbor Data Center?
No lawsuit over Otava Ann Arbor Data Center appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Otava Ann Arbor Data Center use?
No water withdrawal figure for Otava Ann Arbor Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Otava Ann Arbor Data Center, and how big is it?
Otava is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Otava Ann Arbor Data Center," updated September 14, 2026, https://suedatacenters.org/data-centers/otava-ann-arbor-mi.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/otava-ann-arbor-mi, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Secure Cloud Hosting Data Centers in Michigan, Otava Ann Arbor: located in "Avis park, south of downtown"; "Dual Cummins 937.5 KVA diesel generators with 72-hour capacity"; "Dual Eaton 300 KVA UPS battery backup system" · Otava · retrieved September 14, 2026
- 2.OpenStreetMap/Nominatim geocode for Ann Arbor, Washtenaw County, Michigan (city-level pin) · OpenStreetMap · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us