Sue Data Centers

Data Center Registry

SmartTec Site 01 (Mead)

Mead, Bryan County, Oklahoma

ProposedNo reception on recordRecord updated October 28, 2026

SmartTec Site 01 (Mead) is a proposed data center in Mead, Oklahoma (Bryan County), operated by SmartTec by Z1Power. The public record puts it at 39.39 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
SmartTec by Z1Power
Facility type
Data center
Location
8460 US Highway 70, Mead, Bryan County, OK, 73449
Coordinates
34.0005, -96.5111 (approximate)
Power capacity
Not established from a public source
Land
39.39 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Oklahoma Gas & Electric (OG&E)
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 14, 2026
    Proposed
    Land and buildings owned; construction start scheduled 24 September 2026, transformer commissioning 8 October 2026, fiber delivery October-November 2026. Operator states the campus is not yet offering commissioned capacity. Source: SmartTec by Z1Power

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over SmartTec Site 01 (Mead) in Mead, Bryan County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Existing on-site transformer and shared distribution rated 3,000 A at 208 V three-phase across the three buildings (about 1,081 kVA apparent, which the operator says is not an available IT allocation), awaiting OG&E commissioning. As of October 2026 the operator's pages still list commissioning as an 8 October 2026 target marked not completed. The launch plan is grid power; solar and battery storage are a separate, later phase.

Initial proposal is 8 Supermicro systems using direct liquid cooling. The operator's campus concept pairs direct liquid cooling with a closed-loop outdoor chiller plant (the owner's stated intent; the exact model is unconfirmed), while its published financial model, dated 14 September 2026, retains an air-cooled, one-building baseline. The operator does not publish a water-use figure.

Notes on the record

Very small GPU colocation site on US-70 in Bryan County: three existing buildings (A 1,500 sq ft compute, B 2,083 sq ft batteries/utilities, C 3,535 sq ft compute), ~5,035 sq ft of gross data-center area. The operator's initial proposal is 8 Supermicro systems with 64 B300 GPUs. As of October 2026 the operator publishes no IT-load figure for them, so no planned capacity is recorded; a load derived from the GPU count would be an estimate, not a figure the operator states. The operator's shared electrical service is rated about 1,081 kVA (3,000 A at 208 V three-phase), which it says is not an available IT allocation. The record is listed as proposed rather than under construction because the operator's own page, as retrieved in October 2026, still lists construction start as a target (24 September 2026) and does not report that work has begun. Single-source (operator self-published), so the record is marked reported. Coordinates are the town of Mead; the street address did not resolve in OSM.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near SmartTec Site 01 (Mead)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the SmartTec Site 01 (Mead) data center in Mead?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over SmartTec Site 01 (Mead) in Mead, Bryan County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the SmartTec Site 01 (Mead) data center?

No lawsuit over SmartTec Site 01 (Mead) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does SmartTec Site 01 (Mead) use?

No water withdrawal figure for SmartTec Site 01 (Mead) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates SmartTec Site 01 (Mead), and how big is it?

SmartTec by Z1Power is the operator on record. No capacity figure is on record for this site. The site is recorded at 39.39 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "SmartTec Site 01 (Mead)," updated October 28, 2026, https://suedatacenters.org/data-centers/smarttec-site-01-mead-ok.

Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/smarttec-site-01-mead-ok, retrieved November 5, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Mead, Oklahoma Data Center Site, 39.39 acres, Bryan County · SmartTec by Z1Power · retrieved September 14, 2026
  2. 2.Power and cooling, SmartTec Site 01 (grid plan, shared service rating, closed-loop cooling concept) · SmartTec by Z1Power · retrieved October 28, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us