CyrusOne NYM2 (Totowa) is an operating data center in Totowa, New Jersey (Passaic County), operated by CyrusOne. The public record puts it at 6 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- CyrusOne
- Facility type
- Data center
- Location
- 50 Madison Road, Totowa, Passaic County, NJ, 07512
- Coordinates
- 40.9072, -74.2422
- Power capacity
- 6 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026OperatingPublished as an operating data center on CyrusOne's own Totowa facility page. Source: CyrusOne
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne NYM2 (Totowa) in Totowa, Passaic County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
The operator page reports 53.10% carbon-free or renewable electricity and lists 6 MW 'Total IT Capacity' across a 200,000 sq ft, two-building site (50,000 sq ft of data center space).
Water-cooled centrifugal chillers with 2,500 tons of N+1 cooling capacity per the operator. As of October 2026, the heat-rejection equipment is not named, so the cooling type is recorded as unknown.
Notes on the record
200,000 sq ft campus with 50,000 sq ft of data center space on 36-inch raised flooring, 60,000 sq ft of work-area-recovery space, 6 MW total IT capacity and 2,500 tons of N+1 cooling from water-cooled centrifugal chillers. CyrusOne's page lists 53.10% carbon-free or renewable electricity; that reads as a grid-mix statistic rather than a facility procurement claim, so it is not recorded as a renewable-energy percentage. As of September 2026, the heat-rejection method for the chiller plant is not published, so the cooling type is recorded as unknown.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Digital Realty Clifton Campus · Clifton · Digital Realty5 mi · Operating
- ON3 Data Center (275 Kingsland Street) · Nutley · Prism Capital Partners7 mi · Proposed
- 365 Data Centers Carlstadt (NJ3) · Carlstadt · 365 Data Centers11 mi · Operating · 18 MW
- Russo Data Center (600 Commerce Boulevard) · Carlstadt · Russo Development (owner/landlord; tenant confidential)11 mi · Operating
- H5 Data Centers Secaucus (NJ01) · Secaucus · H5 Data Centers12 mi · Operating
- Evocative EWR1 (Secaucus) · Secaucus · Evocative12 mi · Operating · 10 MW
- 165 Halsey Street · Newark · Tishman Real Estate12 mi · Operating · 80 MW
- Centersquare EWR5 (Secaucus) · Secaucus · Centersquare12 mi · Operating
Questions people ask about this site
Is there opposition to the CyrusOne NYM2 (Totowa) data center in Totowa?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne NYM2 (Totowa) in Totowa, Passaic County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the CyrusOne NYM2 (Totowa) data center?
No lawsuit over CyrusOne NYM2 (Totowa) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does CyrusOne NYM2 (Totowa) use?
No water withdrawal figure for CyrusOne NYM2 (Totowa) is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates CyrusOne NYM2 (Totowa), and how big is it?
CyrusOne is the operator on record. We hold 35 sites for that company across the registry. Capacity on record is 6 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "CyrusOne NYM2 (Totowa)," updated October 28, 2026, https://suedatacenters.org/data-centers/cyrusone-nym2-totowa-nj.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cyrusone-nym2-totowa-nj, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.CyrusOne Totowa, NJ: NYM2 data center page · CyrusOne · retrieved October 9, 2026
- 2.OpenStreetMap mapped building 'NYM2', 50 Madison Road, Totowa NJ 07512, via Nominatim · OpenStreetMap contributors · retrieved September 14, 2026
- 3.PeeringDB facility record 2356, 'CyrusOne Totowa', 50 Madison Road, Totowa NJ 07512 · PeeringDB · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us