Mission College Data Center
Santa Clara, Santa Clara County, California · All 4 Oppidan sites
Mission College Data Center is a permitted data center in Santa Clara, California (Santa Clara County), operated by Oppidan.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Oppidan
- Facility type
- Data center
- Location
- 2305 Mission College Boulevard, Santa Clara, Santa Clara County, CA, 95054
- Coordinates
- 37.3887, -121.9668 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Silicon Valley Power
- On site generation
- 78.1 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 13, 2020PermittedNotice of Determination filed for the Mission College Data Center; the CEC granted the small power plant exemption for the associated backup generating facility. Source: California Governor's Office of Land Use and Climate Innovation (CEQAnet)
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Mission College Data Center in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
CEC Small Power Plant Exemption 19-SPPE-05: 43 diesel-fired emergency generators rated 2.5 MW each, arranged in two generation yards, plus two 600 kW house-power units, 78.1 MW total. Electricity is supplied by Silicon Valley Power through a new distribution substation the utility will build and operate on the northeast corner of the site.
Notes on the record
Two three-story data center buildings totalling 490,000 sq ft at Mission College Boulevard and Agnew Road. Operator is recorded as the applicant of record in both fetched filings; secondary reporting associates the site with Amazon Web Services, but no source fetched this session states that, so it is deliberately not asserted here.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CoreSite Bowers Data Center · Santa Clara · CoreSiteunder 1 mile · Permitted · 72 MW · Mixed reception
- EdgeCore Silicon Valley Campus (Laurelwood Data Center) · Santa Clara · EdgeCore Digital Infrastructureunder 1 mile · Operating · 72 MW
- QTS Santa Clara 1 · Santa Clara · QTS Data Centersunder 1 mile · Operating · 7.5 MW
- Digital Realty Silicon Valley SJC30 · Santa Clara · Digital Realtyunder 1 mile · Operating
- Equinix SV2 · Santa Clara · Equinixunder 1 mile · Operating
- Csquare SFO2 · Santa Clara · Csquareunder 1 mile · Operating · 43.2 MW
- Csquare SFO4 · Santa Clara · Csquare1 mi · Operating · 43.1 MW
- Digital Realty Silicon Valley SJC16 · Santa Clara · Digital Realty1 mi · Operating
Questions people ask about this site
Is there opposition to the Mission College Data Center in Santa Clara?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Mission College Data Center in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Mission College Data Center?
No lawsuit over Mission College Data Center appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Mission College Data Center use?
No water withdrawal figure for Mission College Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Mission College Data Center, and how big is it?
Oppidan is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Mission College Data Center," updated September 14, 2026, https://suedatacenters.org/data-centers/mission-college-data-center-santa-clara-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/mission-college-data-center-santa-clara-ca, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Mission College Data Center (19-SPPE-05) · California Energy Commission · retrieved September 14, 2026
- 2.Mission College Data Center, Notice of Determination (SCH 2020040254) · California Governor's Office of Land Use and Climate Innovation (CEQAnet) · retrieved September 14, 2026
- 3.Nominatim geocode of 2305 Mission College Boulevard, Santa Clara, CA · OpenStreetMap contributors · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us