EdgeCore Silicon Valley Campus (Laurelwood Data Center) is an operating data center in Santa Clara, California (Santa Clara County), operated by EdgeCore Digital Infrastructure. The public record puts it at 72 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
EdgeCore Digital Infrastructure
Facility type
Data center
Location
2201 Laurelwood Road, Santa Clara, Santa Clara County, CA, 95054
Coordinates
37.3833, -121.9625 (approximate)
Power capacity
72 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Hybrid
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 14, 2026
    Operating
    Operator lists the Santa Clara campus as a delivered Silicon Valley location; campus totals 72 MW of critical IT load across two buildings at full build-out. Source: EdgeCore Digital Infrastructure

Opposition and litigation at this site

Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over EdgeCore Silicon Valley Campus (Laurelwood Data Center) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

CEC Small Power Plant Exemption 19-SPPE-01 (Laurelwood Data Center, applicant MECP1 Santa Clara 1, LLC): 56 standby diesel-fired generators rated 3.0 MW each and an on-site 60 kV substation, for a maximum electrical load of 99 MW.

Operator describes "generator-backed air cooling and adiabatic dry coolers" with support for direct-to-chip liquid-cooled servers, and states a WUE below 0.01. Classified hybrid because adiabatic dry coolers alternate between dry and evaporatively-assisted operation.

Notes on the record

Two data center buildings totalling over 540,000 sq ft. The CEQA filing gives the site as 13 acres between Juliette Lane and Laurelwood Road; the operator's page says 12 acres, recorded neither as landAcres because the two sourced figures disagree.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near EdgeCore Silicon Valley Campus (Laurelwood Data Center)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the EdgeCore Silicon Valley Campus (Laurelwood Data Center) in Santa Clara?

Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over EdgeCore Silicon Valley Campus (Laurelwood Data Center) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the EdgeCore Silicon Valley Campus (Laurelwood Data Center)?

No lawsuit over EdgeCore Silicon Valley Campus (Laurelwood Data Center) appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does EdgeCore Silicon Valley Campus (Laurelwood Data Center) use?

No water withdrawal figure for EdgeCore Silicon Valley Campus (Laurelwood Data Center) is on record here. Cooling is recorded as hybrid, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates EdgeCore Silicon Valley Campus (Laurelwood Data Center), and how big is it?

EdgeCore Digital Infrastructure is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 72 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "EdgeCore Silicon Valley Campus (Laurelwood Data Center)," updated September 14, 2026, https://suedatacenters.org/data-centers/edgecore-silicon-valley-santa-clara-ca.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgecore-silicon-valley-santa-clara-ca, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Silicon Valley Data Centers, EdgeCore · EdgeCore Digital Infrastructure · retrieved September 14, 2026
  2. 2.Laurelwood Data Center, Mitigated Negative Declaration (SCH 2019089107) · California Governor's Office of Land Use and Climate Innovation (CEQAnet) · retrieved September 14, 2026
  3. 3.Laurelwood Data Center (19-SPPE-01) · California Energy Commission · retrieved September 14, 2026
  4. 4.Nominatim geocode of 2201 Laurelwood Road, Santa Clara, CA · OpenStreetMap contributors · retrieved September 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us