Metter Airport Data Center Campus is a proposed data center in Metter, Georgia (Candler County), operated by Canoochee River RV Resort, LLC (applicant; end user undisclosed). The public record puts it at 470 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Canoochee River RV Resort, LLC (applicant; end user undisclosed)
- Facility type
- Data center
- Location
- 2700 Airport Road, Metter, Candler County, GA
- Coordinates
- 32.3971, -82.0601 (approximate)
- Power capacity
- Not established from a public source
- Land
- 470 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 2026ProposedApplication received by Candler County (fees unpaid as of early October); PUD rezoning of 470 acres from AG-3 requested Source: WTOC
Opposition and litigation at this site
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Metter Airport Data Center Campus in Metter, Candler County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Applicant describes closed-loop, water-efficient cooling systems
Notes on the record
Five buildings of up to 250,000 sq ft each and two on-site substations on 470 acres next to Metter-Candler Airport, south of I-16. Phased over 5 to 7 years to 2033. WTOC reports county talks pointing to a smaller footprint, so the final size is unsettled. A separate city proposal off East Hiawatha Street is not included. Coordinates are the Metter city centroid.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Burkhalter Road Data Center (4AM Development) · Statesboro · 4AM Development, LLC (developer; operator undisclosed)18 mi · Proposed · In litigation
Questions people ask about this site
Is there opposition to the Metter Airport Data Center Campus in Metter?
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Metter Airport Data Center Campus in Metter, Candler County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Metter Airport Data Center Campus?
No lawsuit over Metter Airport Data Center Campus appears in the record we track as of October 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Metter Airport Data Center Campus use?
No water withdrawal figure for Metter Airport Data Center Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Metter Airport Data Center Campus, and how big is it?
Canoochee River RV Resort, LLC (applicant; end user undisclosed) is the operator on record. No capacity figure is on record for this site. The site is recorded at 470 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Metter Airport Data Center Campus," updated October 14, 2026, https://suedatacenters.org/data-centers/canoochee-river-metter-airport-campus-candler-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/canoochee-river-metter-airport-campus-candler-ga, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Anonymous 250,000 sq. ft. Data Center Campus Proposed in Metter, Georgia Makes Headway · Construction Review Online · retrieved October 14, 2026
- 2.Candler County commissioners discuss possible data center near Metter airport · WTOC · retrieved October 14, 2026
- 3.Two groups propose data centers in Metter, Candler County · WTOC · retrieved October 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us