Sue Data Centers

Data Center Registry

Project Atlas Data Center Campus (South Whitehall Township)

South Whitehall Township, Lehigh County, Pennsylvania

ProposedOpposedRecord updated September 25, 2026

Project Atlas Data Center Campus (South Whitehall Township) is a proposed data center in South Whitehall Township, Pennsylvania (Lehigh County), operated by CDE Acquisitions, LLC. The public record puts it at 410 acres, a reported $9 billion investment. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
CDE Acquisitions, LLC
Facility type
Data center
Location
2747 North Cedar Crest Boulevard, South Whitehall Township, Lehigh County, PA, 18104
Coordinates
40.6401, -75.5443 (approximate)
Power capacity
Not established from a public source
Land
410 acres
Investment
$9 billion
Announced
Not established from a public source
Utility
PPL
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 11, 2026
    Proposed
    Revised plan scheduled for a South Whitehall Township public hearing on June 11, 2026, after the developer cut the program from six buildings to three data center buildings plus support structures. Source: WFMZ-TV 69 News

Opposition and litigation at this site

Yes. Organized local opposition to Project Atlas Data Center Campus (South Whitehall Township) in South Whitehall Township, Lehigh County, Pennsylvania is documented in the public record. The South Whitehall Civic Alliance opposes the project outright, "The only acceptable outcome is no data center", and has pledged to fight it up to the Pennsylvania Supreme Court.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

The South Whitehall Civic Alliance opposes the project outright, "The only acceptable outcome is no data center", and has pledged to fight it up to the Pennsylvania Supreme Court. Three buildings of roughly 500,000 sq ft each are proposed 1,700 feet from Parkland High School.

Source: Lehigh Valley Public Media

Power and water

Would be served by a new PPL substation.

Closed-loop cooling requiring no municipal water; the developer says it would avoid over 2.8 billion gallons a year compared with evaporative cooling.

Notes on the record

Three parcels at 2493, 2807 and 2747 N. Cedar Crest Boulevard totalling 410 acres across from Parkland High School, owned by Jeras Corporation, with CDE Acquisitions, LLC of Atlanta as applicant. The revised program is three data center buildings of 492,285 sq ft each plus a 40,680 sq ft administration building and a 39,167 sq ft warehouse, 1,556,702 sq ft in total - down from six buildings over 5 million sq ft. Parking drops from 966 to 399 spaces and weekday trips from 3,865 to 1,154. Includes an on-site electrical substation, emergency generators and a private septic field, with a water main extension requested along Ritter Road. Three barns are to be restored and dedicated to the township; a brick house and farmstead would be removed. Stated construction start November 2029, completion April 2030.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Project Atlas Data Center Campus (South Whitehall Township)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Project Atlas Data Center Campus (South Whitehall Township) in South Whitehall Township?

Yes. Organized local opposition to Project Atlas Data Center Campus (South Whitehall Township) in South Whitehall Township, Lehigh County, Pennsylvania is documented in the public record. The South Whitehall Civic Alliance opposes the project outright, "The only acceptable outcome is no data center", and has pledged to fight it up to the Pennsylvania Supreme Court.

Has anyone filed a lawsuit over the Project Atlas Data Center Campus (South Whitehall Township)?

The reception note on this record refers to a court proceeding. Read it in full under opposition and litigation above, and check the sources at the foot of the page for the filing itself.

How much water does Project Atlas Data Center Campus (South Whitehall Township) use?

No water withdrawal figure for Project Atlas Data Center Campus (South Whitehall Township) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Project Atlas Data Center Campus (South Whitehall Township), and how big is it?

CDE Acquisitions, LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 410 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Atlas Data Center Campus (South Whitehall Township)," updated September 25, 2026, https://suedatacenters.org/data-centers/cde-acquisitions-project-atlas-south-whitehall-lehigh-pa.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cde-acquisitions-project-atlas-south-whitehall-lehigh-pa, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Plans change for proposed South Whitehall data center; here's what's on the table now · WFMZ-TV 69 News · retrieved September 12, 2026
  2. 2.Residents push for public hearing as South Whitehall takes new look at hyperscale data center · Lehigh Valley Public Media · retrieved September 25, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us