Data Center Registry
J.G. Petrucci Allentown Data Center (1024 N. Bradford St.)
Allentown, Lehigh County, Pennsylvania
J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) is a proposed data center in Allentown, Pennsylvania (Lehigh County), operated by J.G. Petrucci Co. The public record puts it at 100 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- J.G. Petrucci Co.
- Facility type
- Data center
- Location
- 1024 N. Bradford Street, Allentown, Lehigh County, PA
- Coordinates
- 40.6023, -75.4716 (approximate)
- Power capacity
- 100 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 20, 2026ProposedPlans submitted for a 146,000 sq ft data center with an on-site substation. Construction could begin early 2027. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) in Allentown, Lehigh County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Site was previously approved for the Allentown Flex Center industrial development. The developer did not comment. The census geocoder could not match the N. Bradford St address, so the pin is the Allentown city centroid.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Flexential Allentown Data Center (ABE01) · Allentown · Flexential2 mi · Operating
- Quantm Group Allentown Data Center (2401 W. Emaus Ave.) · Allentown · Quantm Group LLC2 mi · Proposed · 80 MW
- Project Atlas Data Center Campus (South Whitehall Township) · South Whitehall Township · CDE Acquisitions, LLC5 mi · Proposed · Opposed
- Prologis Allen Township Data Center (2500 Liberty Drive) · Allen Township · Prologis7 mi · Permitted
- Cetronia Road Data Center (former Air Products site) · Trexlertown · Air Products7 mi · Cancelled · Contested
- DTA Alliance Data Center Campus (Blue Shamrock Golf Course / Alliance Sand Quarry) · Lower Towamensing Township · DTA Alliance LLC / Murphy's Meadow LLC16 mi · Proposed · Contested
- Lower Mount Bethel Tech Center · Lower Mount Bethel Township · Peron Development / J.G. Petrucci Co.21 mi · Proposed · 1.2 GW · Opposed
- Limerick Township Data Center Campus (MCD 7) · Limerick Township · MCD 7 LLC25 mi · Proposed · 750 MW · Opposed
Questions people ask about this site
Is there opposition to the J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) in Allentown?
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) in Allentown, Lehigh County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the J.G. Petrucci Allentown Data Center (1024 N. Bradford St.)?
No lawsuit over J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) appears in the record we track as of October 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) use?
No water withdrawal figure for J.G. Petrucci Allentown Data Center (1024 N. Bradford St.) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates J.G. Petrucci Allentown Data Center (1024 N. Bradford St.), and how big is it?
J.G. Petrucci Co. is the operator on record. Capacity on record is 100 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "J.G. Petrucci Allentown Data Center (1024 N. Bradford St.)," updated October 15, 2026, https://suedatacenters.org/data-centers/jg-petrucci-1024-n-bradford-street-allentown-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/jg-petrucci-1024-n-bradford-street-allentown-pa, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.100MW Data Center Proposed In Allentown, Pennsylvania · Baxtel · retrieved October 15, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us