Sue Data Centers

Data Center Registry

CalEthos Lithium Valley Data Center Campus

El Centro, Imperial County, California

ProposedNo reception on recordAI likelyRecord updated July 23, 2026

CalEthos Lithium Valley Data Center Campus is a proposed data center in El Centro, California (Imperial County), operated by CalEthos, Inc. The public record puts it at 315 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
CalEthos, Inc.
Facility type
Data center, AI use likely
Location
El Centro, Imperial County, CA
Coordinates
32.7900, -115.5600
Power capacity
Not established from a public source
Land
315 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Imperial Irrigation District (IID)
Power source
Mixed
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of July 23, 2026. No lawsuit, organized opposition, or contested hearing over CalEthos Lithium Valley Data Center Campus in El Centro, Imperial County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Geothermal/solar via the Imperial Irrigation District (IID) - a separate balancing authority from CAISO, which does not itself operate a load interconnection queue.

Notes on the record

First phase now ~300-420MW (expanded from an original 80-acre/300MW plan; a range, so omitted from capacityMw); part of a planned 1M sq ft, 3-4 phase campus. Land purchase completed; permitting/engineering underway with American Dark Fiber. Distinct, competing developer from the existing tracked Imperial Valley Computer Manufacturing (Sebastian Rucci/IVCM) project in the same county. Coordinates are approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Our reporting on this site

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the CalEthos Lithium Valley Data Center Campus in El Centro?

Nothing on record as of July 23, 2026. No lawsuit, organized opposition, or contested hearing over CalEthos Lithium Valley Data Center Campus in El Centro, Imperial County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the CalEthos Lithium Valley Data Center Campus?

No lawsuit over CalEthos Lithium Valley Data Center Campus appears in the record we track as of July 23, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does CalEthos Lithium Valley Data Center Campus use?

No water withdrawal figure for CalEthos Lithium Valley Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates CalEthos Lithium Valley Data Center Campus, and how big is it?

CalEthos, Inc. is the operator on record. No capacity figure is on record for this site. The site is recorded at 315 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "CalEthos Lithium Valley Data Center Campus," updated July 23, 2026, https://suedatacenters.org/data-centers/calethos-lithium-valley-imperial-county-ca.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/calethos-lithium-valley-imperial-county-ca, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.CalEthos expands data center plans for Lithium Valley, California, with 315-acre land purchase · Data Center Dynamics · retrieved July 9, 2026
  2. 2.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us