Prologis STEM Park
San Jose, Santa Clara County, California · All 9 Prologis sites
Prologis STEM Park is a proposed data center in San Jose, California (Santa Clara County), operated by Prologis. The public record puts it at announced November 2025, 396 MW planned, 159 acres. It has documented public support and no documented opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Prologis
- Facility type
- Data center, AI use likely
- Location
- San Jose, Santa Clara County, CA
- Coordinates
- 37.4230, -121.9430 (approximate)
- Power capacity
- 396 MW planned
- Land
- 159 acres
- Investment
- Not established from a public source
- Announced
- November 2025
- Utility
- Pacific Gas & Electric (PG&E)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Supported
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Not that we can document. Local officials or residents have expressed public support for Prologis STEM Park in San Jose, Santa Clara County, California, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 26, 2026. San José City Council unanimously selected Prologis as preferred developer (Nov 2025); no organized opposition documented.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.
San José City Council unanimously selected Prologis as preferred developer (Nov 2025); no organized opposition documented.
Notes on the record
159-acre city-owned parcel at Hwy 237 & Zanker Road, North San Jose (bounded by Los Esteros Energy Center, Artesian Slough, Hwy 237, and the Silicon Valley Advanced Water Purification Center). Prologis selected as preferred developer by San Jose City Council (unanimous vote, Nov 18 2025) over Catellus-Deca and Trammell Crow proposals; CEQA review and ground-lease negotiation still pending as of source dates, not yet approved. 'STEM Park' = Sustainable Technology, Engineering and Manufacturing Park: four 99MW data-center buildings (1.68M sq ft total, capacityMw above) plus a separate ~785,000 sq ft / 100MW advanced-manufacturing component (not counted in capacityMw, different use). PG&E has committed initial 250MW via dual feed from the Los Esteros 230kV substation within 30-36 months. ~$25B investment widely reported (DCD et al.) but not confirmed directly by Prologis, omitted from investmentUsd. Projected 6,000+ jobs and $30M/yr city tax revenue are projections tied to a not-yet-approved project, not delivered counts, omitted from jobs numeric. A separate, already-tracked Prologis site (prologis-silver-creek-valley-san-jose-ca) and another new Prologis San Jose site (prologis-rue-ferrari-san-jose-ca, this same batch) are distinct parcels, not duplicates.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Microsoft Alviso Data Center Campus · San Jose (Alviso) · Microsoft2 mi · Under construction · 48 MW
- Csquare SFO2 · Santa Clara · Csquare3 mi · Operating · 43.2 MW
- QTS Santa Clara 1 · Santa Clara · QTS Data Centers3 mi · Operating · 7.5 MW
- CoreSite Bowers Data Center · Santa Clara · CoreSite3 mi · Permitted · 72 MW · Mixed reception
- Terra Data Center · San Jose · Terra Ventures3 mi · Proposed
- Equinix SV2 · Santa Clara · Equinix3 mi · Operating
- STACK SVY01 · San Jose · STACK Infrastructure3 mi · Operating · 100 MW
- Digital Realty Silicon Valley SJC30 · Santa Clara · Digital Realty3 mi · Operating
Questions people ask about this site
Is there opposition to the Prologis STEM Park data center in San Jose?
Not that we can document. Local officials or residents have expressed public support for Prologis STEM Park in San Jose, Santa Clara County, California, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 26, 2026. San José City Council unanimously selected Prologis as preferred developer (Nov 2025); no organized opposition documented.
Has anyone filed a lawsuit over the Prologis STEM Park data center?
No lawsuit over Prologis STEM Park appears in the record we track as of July 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Prologis STEM Park use?
No water withdrawal figure for Prologis STEM Park is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Prologis STEM Park, and how big is it?
Prologis is the operator on record. We hold 9 sites for that company across the registry. Capacity on record is 396 MW. The site is recorded at 159 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Prologis STEM Park," updated July 26, 2026, https://suedatacenters.org/data-centers/prologis-stem-park-zanker-road-san-jose-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prologis-stem-park-zanker-road-san-jose-ca, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.400MW Prologis data center campus chosen as preferred project on city-owned land in San Jose, California · Data Center Dynamics · retrieved July 11, 2026
- 2.Prologis Inc. Wins Bid for One of the Largest Economic Development Projects in South Bay · San José Inside · retrieved July 11, 2026
- 3.Prologis favored for San Jose data center site · The Real Deal · retrieved July 11, 2026
- 4.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
- 5.GovTech (Government Technology Insider), "San Jose Eyes $30M Windfall From Proposed AI and Manufacturing Campus" · retrieved July 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us