Brightstar Lottery Enterprise Data Center (West Greenwich) is an operating data center in West Greenwich, Rhode Island (Kent County), operated by Brightstar Lottery PLC.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Brightstar Lottery PLC
- Facility type
- Data center
- Location
- 47 Technology Way, West Greenwich, Kent County, RI, 02817
- Coordinates
- 41.6584, -71.5703 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 19, 2026OperatingListed in the FY2025 Form 20-F property table (as of Feb 19, 2026) as an owned enterprise data center in use for data center and network operations at 100% utilization. Source: U.S. SEC (EDGAR)
Opposition and litigation at this site
Nothing on record as of October 26, 2026. No lawsuit, organized opposition, or contested hearing over Brightstar Lottery Enterprise Data Center (West Greenwich) in West Greenwich, Kent County, Rhode Island appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Brightstar Lottery PLC (formerly International Game Technology PLC) owns an enterprise data center of about 13,050 sq ft at 47 Technology Way in West Greenwich. Its FY2025 Form 20-F lists it as used for data center and network operations at 100% utilization. No power capacity is disclosed. The coordinates are an OSM street-address geocode, not a parcel-confirmed point. No AI or HPC use is named at this site, so no AI classification is recorded.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Prov.net 1155 Westminster St · Providence · Provdotnet LLC13 mi · Operating
- Providence RI2 (former Crown Castle Fiber / Lightower), 300 Carpenter St · Providence · Zayo (formerly Crown Castle Fiber)13 mi · Operating
- Lumen Providence (375 Promenade St) · Providence · Lumen Technologies14 mi · Operating
- Providence RI1 (former Crown Castle Fiber / Lightower), The Foundry, 235 Promenade St · Providence · Zayo (formerly Crown Castle Fiber)14 mi · Operating
- Hanton City Business Park (data center anchor) · Smithfield · Hanton City Investments LLC15 mi · Proposed · Opposed
- NE Edge Killingly Data Center (125 Alexander Parkway) · Killingly · NE Edge LLC22 mi · Proposed
Questions people ask about this site
Is there opposition to the Brightstar Lottery Enterprise Data Center (West Greenwich) in West Greenwich?
Nothing on record as of October 26, 2026. No lawsuit, organized opposition, or contested hearing over Brightstar Lottery Enterprise Data Center (West Greenwich) in West Greenwich, Kent County, Rhode Island appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Brightstar Lottery Enterprise Data Center (West Greenwich)?
No lawsuit over Brightstar Lottery Enterprise Data Center (West Greenwich) appears in the record we track as of October 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Brightstar Lottery Enterprise Data Center (West Greenwich) use?
No water withdrawal figure for Brightstar Lottery Enterprise Data Center (West Greenwich) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Brightstar Lottery Enterprise Data Center (West Greenwich), and how big is it?
Brightstar Lottery PLC is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Brightstar Lottery Enterprise Data Center (West Greenwich)," updated October 26, 2026, https://suedatacenters.org/data-centers/brightstar-lottery-west-greenwich-ri.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/brightstar-lottery-west-greenwich-ri, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Brightstar Lottery PLC Form 20-F FY2025, Item 4.D Property, Plants and Equipment · U.S. SEC (EDGAR) · retrieved October 26, 2026
- 2.International Game Technology PLC Form 20-F FY2024 · U.S. SEC (EDGAR) · retrieved October 26, 2026
- 3.OpenStreetMap Nominatim geocode of 47 Technology Way, West Greenwich, RI · OpenStreetMap · retrieved October 26, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us