Sue Data Centers

Data Center Registry

Red Butte Energy and Data Center Campus

Newcastle, Iron County, Utah

ProposedNo reception on recordRecord updated September 1, 2026

Red Butte Energy and Data Center Campus is a proposed data center in Newcastle, Utah (Iron County), operated by BrightNight. The public record puts it at 1.5 GW planned, 2,600 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
BrightNight
Facility type
Data center
Location
Newcastle, Iron County, UT
Coordinates
37.6949, -113.9430 (approximate)
Power capacity
1.5 GW planned
Land
2,600 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Mixed
Cooling
Closed loop
Water use
Not established from a public source
Jobs
500 permanent
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. May 22, 2026
    Proposed
    Application submitted May 4, 2026 and deemed incomplete May 22, 2026; on hold under Iron County's 180-day data center moratorium. Source: Iron County, Utah

Opposition and litigation at this site

Nothing on record as of September 1, 2026. No lawsuit, organized opposition, or contested hearing over Red Butte Energy and Data Center Campus in Newcastle, Iron County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Planned hybrid power: 300MW solar, 1,200MWh battery storage, and 1.5GW natural gas generation.

"expected to rely primarily on air-cooled and closed-loop cooling systems designed to reduce water consumption." Recorded as closed_loop per the methodology tie-breaker: air-cooled chillers over a recirculating circuit are closed_loop; `air` is reserved for designs with no cooling water circuit at all.

Notes on the record

Approximately 8 miles north of Newcastle, roughly 20 miles from Cedar City; application on hold pending the county's data-center moratorium. Subsidies checked (2026-09-08): structural zero, the project is proposed and on hold under Iron County's moratorium, and no Iron County or Newcastle CRA/RDA was found to execute a pre-approval participation agreement; Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Questions people ask about this site

Is there opposition to the Red Butte Energy and Data Center Campus in Newcastle?

Nothing on record as of September 1, 2026. No lawsuit, organized opposition, or contested hearing over Red Butte Energy and Data Center Campus in Newcastle, Iron County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Red Butte Energy and Data Center Campus?

No lawsuit over Red Butte Energy and Data Center Campus appears in the record we track as of September 1, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Red Butte Energy and Data Center Campus use?

No water withdrawal figure for Red Butte Energy and Data Center Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Red Butte Energy and Data Center Campus, and how big is it?

BrightNight is the operator on record. Capacity on record is 1.5 GW. The site is recorded at 2600 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Red Butte Energy and Data Center Campus," updated September 1, 2026, https://suedatacenters.org/data-centers/brightnight-red-butte-newcastle-ut.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/brightnight-red-butte-newcastle-ut, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Red Butte Energy and Data Center Campus · BrightNight · retrieved August 25, 2026
  2. 2.Proposed Data Center Information, Iron County · Iron County, Utah · retrieved August 25, 2026
  3. 3.AI campus proposed in Iron County could bring 500 jobs, on-site power generation · St. George News · retrieved September 1, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us