Standard Power Coshocton is an operating crypto mining site in Coshocton, Ohio (Coshocton County), operated by Standard Power. The public record puts it at 50 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Standard Power
Facility type
Crypto mining
Location
500 N. Fourth St., Coshocton, Coshocton County, OH
Coordinates
40.2772, -81.8649 (approximate)
Power capacity
50 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Energy Harbor
Power source
Nuclear
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
20 permanent
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. December 2021
    Operating
    Nuclear power supply to the Bitcoin blockchain mining center began December 2021. Source: Energy Harbor / PR Newswire

Opposition and litigation at this site

Nothing on record as of August 27, 2026. No lawsuit, organized opposition, or contested hearing over Standard Power Coshocton in Coshocton, Coshocton County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Five-year agreement announced 2021 for Energy Harbor to supply carbon-free nuclear electricity to the site beginning December 2021; Standard Power stated 100% of the power associated with the facility is carbon-free.

Notes on the record

Converted from the former WestRock paper mill, which closed in 2015. Coordinates are a street-level geocode of the published address.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Standard Power Coshocton data center in Coshocton?

Nothing on record as of August 27, 2026. No lawsuit, organized opposition, or contested hearing over Standard Power Coshocton in Coshocton, Coshocton County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Standard Power Coshocton data center?

No lawsuit over Standard Power Coshocton appears in the record we track as of August 27, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Standard Power Coshocton use?

No water withdrawal figure for Standard Power Coshocton is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Standard Power Coshocton, and how big is it?

Standard Power is the operator on record. Capacity on record is 50 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Standard Power Coshocton," updated August 27, 2026, https://suedatacenters.org/data-centers/standard-power-coshocton-oh.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/standard-power-coshocton-oh, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Energy Harbor partners with Standard Power to provide carbon-free nuclear power to new Ohio Bitcoin blockchain mining center · Energy Harbor / PR Newswire · retrieved August 27, 2026
  2. 2.Coshocton's Standard Power center powers blockchain mining for Ohio · Frontier Group of Companies (reprint of Coshocton Tribune reporting) · retrieved August 27, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us