Iron Mountain Boston Data Center (BOS-1)

Northborough, Worcester County, Massachusetts · All 14 Iron Mountain sites

OperatingNo reception on recordRecord updated September 15, 2026

Iron Mountain Boston Data Center (BOS-1) is an operating data center in Northborough, Massachusetts (Worcester County), operated by Iron Mountain. The public record puts it at 3.6 MW planned, 58.3 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Iron Mountain
Facility type
Data center
Location
171 Bearfoot Road, Northborough, Worcester County, MA, 01532
Coordinates
42.3409, -71.6371 (approximate)
Power capacity
1.2 MW operating; 3.6 MW planned
Land
58.3 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Grid
Cooling
air
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Boston Data Center (BOS-1) in Northborough, Worcester County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Facility power is "matched by 100% renewable energy" per the operator (renewable energy matching/certificates against grid draw, not confirmed on-site generation).

Operator states a "waterless cooling design", no cooling-water circuit at all, so classified air per the contract's cooling-type tie-breaker.

Notes on the record

22,000 sq ft building on a 58.3-acre campus; LEED Gold certified and rated to withstand Category 4 hurricane winds; operator states a dedicated dark-fiber link to Boston's 1 Summer Street carrier hotel. "Currently provides 1.2 MW operationally, with 3.6 MW of total potential critical power capacity", recorded as operational 1.2 / planned 3.6.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Iron Mountain Boston Data Center (BOS-1)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Iron Mountain Boston Data Center (BOS-1) in Northborough?

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Boston Data Center (BOS-1) in Northborough, Worcester County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Iron Mountain Boston Data Center (BOS-1)?

No lawsuit over Iron Mountain Boston Data Center (BOS-1) appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Iron Mountain Boston Data Center (BOS-1) use?

No water withdrawal figure for Iron Mountain Boston Data Center (BOS-1) is on record here. Cooling is recorded as air, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Iron Mountain Boston Data Center (BOS-1), and how big is it?

Iron Mountain is the operator on record. We hold 14 sites for that company across the registry. Capacity on record is 3.6 MW. The site is recorded at 58.3 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Iron Mountain Boston Data Center (BOS-1)," updated September 15, 2026, https://suedatacenters.org/data-centers/ironmountain-bos1-northborough-ma.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ironmountain-bos1-northborough-ma, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Boston Data Center | Boston Colocation | Iron Mountain United States · Iron Mountain · retrieved September 12, 2026
  2. 2.PeeringDB facility record: Iron Mountain Data Center - Boston (BOS-1), 171 Bearfoot Rd, Northborough MA 01532 · PeeringDB · retrieved September 15, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us