DC BLOX Myrtle Beach Cable Landing Station
Myrtle Beach, Horry County, South Carolina · All 12 DC BLOX sites
DC BLOX Myrtle Beach Cable Landing Station is an operating data center in Myrtle Beach, South Carolina (Horry County), operated by DC BLOX. The public record puts it at 19 MW planned, 20 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- DC BLOX
- Facility type
- Data center
- Location
- 1401 Howard Avenue, Myrtle Beach, Horry County, SC, 29577
- Coordinates
- 33.6746, -78.9441
- Power capacity
- 19 MW planned
- Land
- 20 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Evaporative
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 10, 2023OperatingDC BLOX opened the cable landing station, the first subsea cable landing facility in South Carolina. Source: DC BLOX
Opposition and litigation at this site
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over DC BLOX Myrtle Beach Cable Landing Station in Myrtle Beach, Horry County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
125,000 sq ft and 19 MW at full build-out, in the International Technology & Aerospace Park. Landing point for the Google Firmina and Nuvem cables and Meta's Anjana cable. DC BLOX announced an expansion on 2025-10-14 to add capacity for five more subsea cables. Coordinates come from the named OSM feature for the facility itself. Re-checked 2026-09-10 (DC BLOX's own Myrtle Beach facility page, source dated after this record's 2026-08-26 lastUpdated): status unchanged, still operational (with a second facility on the same campus 'in development' per the expansion announcement), no flip. energy: confirmed absence, no utility name or grid/on-site-generation disclosure found in any source checked. investmentUsd: confirmed absence, neither the 2023 opening announcement nor the Oct 2025 expansion announcement discloses a dollar figure for Myrtle Beach specifically (DC BLOX's disclosed green-loan financing figures apply company-wide/to other campuses, not this site). aiClassification: left unset, CEO framing ('leverage this infrastructure to create an AI-driven future') is generic aspirational language about the company's broader direction, not a statement that this cable-landing-station site itself is AI-dedicated; not enough to classify. jobs: confirmed absence, no jobs figure in any source checked. subsidies: confirmed absence in every press source checked (DC BLOX's own site, the 2023 opening announcement, the Oct 2025 expansion announcement), no FILOT or incentive agreement mentioned. This is a press-coverage-level absence only; Horry County's council-minutes/ordinance portal and the ITAP authority's own site were not reachable this session (DNS failures on guessed domains), so a stronger county-tier confirmation is unresolved, not ruled out. community: confirmed absence of independent local-reception reporting, a Sept 8 2026 company-wide 'Community Commitment' pledge announcement references Myrtle Beach only via a linked headline, not in its own body text, so it does not count as site-specific community evidence and was not used to set community.status.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the DC BLOX Myrtle Beach Cable Landing Station data center in Myrtle Beach?
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over DC BLOX Myrtle Beach Cable Landing Station in Myrtle Beach, Horry County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the DC BLOX Myrtle Beach Cable Landing Station data center?
No lawsuit over DC BLOX Myrtle Beach Cable Landing Station appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does DC BLOX Myrtle Beach Cable Landing Station use?
No water withdrawal figure for DC BLOX Myrtle Beach Cable Landing Station is on record here. Cooling is recorded as evaporative, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates DC BLOX Myrtle Beach Cable Landing Station, and how big is it?
DC BLOX is the operator on record. We hold 12 sites for that company across the registry. Capacity on record is 19 MW. The site is recorded at 20 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "DC BLOX Myrtle Beach Cable Landing Station," updated September 10, 2026, https://suedatacenters.org/data-centers/dc-blox-myrtle-beach-cls-sc.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/dc-blox-myrtle-beach-cls-sc, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.DC BLOX Opens Myrtle Beach Cable Landing Station · DC BLOX · retrieved August 26, 2026
- 2.OpenStreetMap Nominatim record for DC BLOX Myrtle Beach Cable Landing Station, 1401 Howard Avenue · OpenStreetMap · retrieved August 26, 2026
- 3.DC BLOX Myrtle Beach Cable Landing Station (MYR1) · DC BLOX · retrieved September 10, 2026
- 4.DC BLOX Set to Expand Myrtle Beach Cable Landing Station · DC BLOX · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us